This paper will be limited to a consideration of the construction of the tunnels, the broader questions of design, etc., having already been considered in papers by Brig.-Gen. Charles W. Raymond, M. Am. Soc. C. E., and Alfred Noble, Past-President, Am. Soc. C. E.
The location of the section of the work to be considered here is shown on Plate XIII of Mr. Noble's paper. There are two permanent shafts on each side of the East River and four single cast-iron tube tunnels, each about 6,000 ft. long, and consisting of 3,900 ft. between shafts under the river, and 2,000 ft. in Long Island City, mostly under the depot and passenger yard of the Long Island Railroad. This tube-tunnel work was naturally a single job. The contract for its construction was let to S. Pearson and Son, Incorporated, ground being broken on May 17th, 1904. Five years later, to a day, the work was finished and received its final inspection for acceptance by the Railroad Company.
The contract was of the profit-sharing type, and required an audit, by the Railroad Company, of the contractor's books, and a careful system of cost-keeping by the Company's engineers, so that it is possible to include in the following some of the unit costs of the work. These are given in two parts: The first is called the unit labor cost, and is the cost of the labor in the tunnel directly chargeable to the thing considered. It does not include the labor of operating the plant, nor watchmen, yardmen, pipemen, and electricians. The second is called top charges, a common term, but meaning different things to different contractors and engineers. Here, it is made to include the cost of the contractor's staff and roving laborers, such as pipemen, electricians, and yardmen, the cost of the plant and its operation, and all miscellaneous expenses, but does not include any contractor's profit, nor cost of materials entering permanent work.
The contractors carried on their work from three different sites. From permanent shafts, located near the river in Manhattan, four shields were driven eastward to about the middle of the river; and, from two similar shafts at the river front in Long Island City, four shields were driven westward to meet those from Manhattan. From a temporary shaft, near East Avenue, Long Island City, the land section of about 2,000 ft. was driven to the river shafts.
James H. Brace
Francis Mason
S. H. Woodard
---
TRANSACTIONS
Paper No. 1159
Tunnels From East Avenue To the River Shafts.
Excavation In All Rock.
Excavation in Earth and Rock.
Tunneling in Compressed Air Without a Shield.
Concrete Cradles, Hand-Packed Stone and Grouting.
Erection of Iron Lining.
Long Island Shafts.
TABLE 1.—Relation of the Final Position of the Caissons to That Designed.
Manhattan Shafts.
River Tunnels.
Tunnels Driven Eastward from Manhattan.
Tunnels Driven Westward from Long Island City.
Methods of Excavation.
Line B, Long Island.
Line C, Long Island.
Line D, Long Island.
Line A, Manhattan.
Line B, Manhattan.
Line C, Manhattan.
Line D, Manhattan.
Special Difficulties.
Guiding the Shields.
Injuries to Shields.
Settlement at Surface of Ground.
Clay Blanket.
Iron Lining.
Grouting.
Caulking and Leakage.
Sump and Pump Chambers.
Concrete Lining.
Electric Conduits.
FOOTNOTES: