THE VEGETABLE MARKET

The ground plan of this building is irregular; having been constructed at different periods. It approaches the Roman Doric order—is supported by brick columns plastered, and covered with a wooden frame roof tiled. It fronts on Old Levee, St. Philip and Ursuline streets, and the river. The design was by J. Pilié, who superintended the work. It was completed in 1830, at an expense of $25,800.