Railway Troops
While Germany, inspired by the American example, had begun the creation of special bodies of Railway Troops in 1866, it was not until 1882 that a like course was adopted in England. Prior to the last-mentioned year it was, possibly, thought that the labour branch of the Engineer and Railway Volunteer Staff Corps would suffice to meet requirements in regard to the destruction or the re-establishment of railways at home in the event of invasion; but the arrangements of the Corps did not provide for the supply of men to take up railway construction and operation on the occasion of military expeditions to other countries.
It was this particular need that led, in the summer of 1882, to the conversion of the 8th Company of Royal Engineers into the 8th (Railway) Company, R.E., the occasion therefore being the dispatch of an expeditionary force under Sir Garnet (afterwards Lord) Wolseley to Egypt, where the necessity for railway work of various kinds was likely to arise. This pioneer corps of British Railway Troops was formed of seven officers, one warrant officer, two buglers, and ninety-seven N.C.O.'s and sappers. So constituted, it was thought better adapted for railway work under conditions of active service than a body of civilian railwaymen would be. There certainly was the disadvantage that those constituting the 8th were not then proficient in railway matters; but, before they left, both officers and men were given the run of the London, Chatham and Dover Railway lines, and were there enabled to pick up what they could of railway working in the locomotive and traffic departments, while on the London and South Western and the South Eastern Railways they were initiated, as far as could be done in the time, into the art of platelaying. The Corps took out to Egypt four small tank locomotives; two first-class, two second-class and six third-class carriages; forty cattle trucks; four brake vans; two travelling cranes; two breakdown vans, and five miles of permanent way, complete, with accessories, tools, etc. Excellent work was done in carrying on regular train services, repairing damaged track, etc., running an armoured train, constructing supplementary short lines, and conveying troops, sick and wounded, and stores, the practical utility of such an addition to the engineering forces of the Army being thus fully assured.
In January, 1885, the 10th Company, Royal Engineers, was converted into the 10th (Railway) Company, and sent to Egypt to assist in the construction of the then contemplated Suakin-Berber line, to which further reference will be made in Chapter XV. Both companies also rendered good service in the South African War.
According to the "Manual of Military Railways," issued with Army Orders dated March 1st, 1889, the duties likely to be required from the Royal Engineers with regard to railways are as follows:— (1) Laying, working, and maintaining a military line of railway between two places; (2) restoring an existing line which has been damaged or destroyed by an enemy; (3) destroying an existing line as much as possible with a given number of men and in a specified time, and (4) working and maintaining an existing line. The "Manual" itself gave much technical information as to the construction, maintenance, destruction and working of railways. It was re-issued by the War Office in 1898 as Part VI of "Instruction in Military Engineering," and was stated to embody a portion of the course of instruction in railways at the school of Military Engineering, Chatham. In the "Manual of Military Engineering," issued by the General Staff of the War Office in 1905, instructions are given (Chap. XVII, pars. 238-244) on the "hasty demolition, without explosives," of railways, stations, buildings, rolling stock, permanent way, water supply, etc.; and in Chapter XXIII, "Railways and Telegraphs," the statement is made that—
The duties likely to be required of troops in the field with regard to railways (apart from large railway schemes, for which special arrangements would be necessary,) may be considered as either temporary repairs or the laying of short lengths of line to join up breaks, the construction of additional works, such as platforms, etc., to adapt the line for military use, or the demolition of an existing line.
Detailed information is given, for the benefit of R.E. officers, concerning railway construction, repair and reconstruction, and the main principles on which such work should be carried out for military purposes are explained. The best system to adopt for the effecting of rapid repairs is said to be that of establishing construction trains. "The reconstruction staff live in these trains, which rapidly advance along the line as it is being repaired, conveying, also, the necessary material."
The peace training[35] of the Companies includes: reconnaissance, survey and final location of a railway; laying out station yards; laying out deviations; rapid laying of narrow-gauge "military" lines; construction of all kinds of railway bridges; signal installation; water supply; repairs to telegraphs and telephones necessary for working construction lines; working of electric block instruments; fitting up armoured trains; construction of temporary platforms, and working and maintenance of construction trains.
Instruction in reconnaissance and survey work is given to officers while at head-quarters, and a certain number of N.C.O.'s and men are also instructed in railway survey work. Parties, each commanded by an officer, are sent to carry out a reconnaissance and final location of a railway between two points about forty miles apart on the assumption that it is an unmapped country, and complete maps and sections are prepared. The Companies have also undertaken the construction and maintenance of the Woolmer Instructional Military Railway,—a 4 ft. 8½ in. gauge military line, about six miles in length, connecting Bordon (London and South Western Railway) with Longmore Camp. All the plant necessary for railway work and workshops for the repair of rolling stock are provided at Longmore.
In time of war the chief duties of a Railway Company, R.E., would be to survey, construct, repair and demolish railways and to work construction and armoured trains.
In the South African campaign, when the military had to operate the railways of which they took possession in the enemy's country, some difficulty was experienced in obtaining from the ranks of the Army a sufficient number of men capable of working the lines. As the result of these conditions, it was arranged, in 1903, between the War Office and certain of the British railway companies that the latter should afford facilities in their locomotive departments and workshops for the training of a number of non-commissioned officers and men as drivers, firemen and mechanics, (capable of carrying out repairs,) in order to qualify them better for railway work in the field, in case of need. This arrangement was carried out down to the outbreak of war in 1914. The period of training lasted either six or nine months. In order to avoid the raising of any "labour" difficulties, no wages were given during this period to Army men who were already receiving Army pay as soldiers, but a bonus was granted to them by the railway companies, when they left, on their obtaining from the head of the department to which they had been attached a certificate of their efficiency.