FINAL ADJUSTING OF GRADES.

Fig. 29.

61. The general arrangement of inclines must not be interfered with to save work, but a large part of the excavation and embankment may be saved by breaking up long grades so as not to affect materially the character of the road. Upon some lines the grades must necessarily undulate, as in fig. 29. The difference in the amount of work is plainly seen. The steepest grades thus applied must not be greater than the ruling grade upon the travel of one engine.

62. In long and shallow cuts and fills, the best plan is to place the grade line quite high, avoiding much cutting, and to make the embankments from side cuttings, (ditching). Banks must at least be placed two or three feet above the natural surface, first to prevent the snow from lodging too much upon the rails, second, to insure draining.

63. Snow fences are much used in the northern parts of the United States. These are high pieces of lattice-work, made roughly, but well braced; from eight to twelve feet high, and standing from sixty to one hundred feet from the road. The object of the fence is to break the current of the wind, and cause it to precipitate its snow. Close fences effect the object no better than the open ones, are more liable to blow down, and cost more.

64. In locating a road which is to have a double track eventually, regard must be paid to this fact in side-hill work. The first track should, if possible, be so placed as not to require moving when the double line is put on.