ROCK EXCAVATION.
125. The sides of rock excavation are sometimes cut to a small slope, as one fourth or one fifth horizontal to one vertical, and sometimes cut quite perpendicularly. The earth, when it occurs, which covers the rock, is first taken out at the proper slope; a berm of one or two feet being left between the foot of the earth and the crest of the rock.
126. Rock is taken out one or two feet below grade, as well as earth, to allow the introduction of the necessary ballast.