Detour Signs.

—Perhaps nothing is more exasperating to the tourist than to come to a barricade with the word “Detour,” and then find the detour road practically impassable. In many states the contractor on a piece of construction work is obligated to care for detour roads and detour signs during the time the road is closed. Finding the obligation not well fulfilled several of the states are taking over that work in order that it might be done in a manner to satisfy the traveling public. Wisconsin[232] considers the proper marking and maintaining of detours more important than similar work of the regular trunk routes, for well-marked detours are necessary to keep enthusiasm for good road construction alive. Minnesota, North Carolina, and other states have adopted similar plans.

Before a road is closed a detour is selected and marked and thus automatically becomes a part of the state trunk line system. A map sign is placed at the ends of long detours showing the road under construction, the detour, the location of railways, cities, and prominent natural features. The traveler thus gets a definite idea of the way he must go to return to the main highway. Ordinary markers are placed along the line of detour.

In Connecticut and some other states a half width of the roadway is paved at a time, allowing the other half to be used while the first half is under construction. This is possible where the detour is not too long, or if there is passing room in the one-half way. Concrete is well adapted for this sort of construction. The joint down the center is a benefit rather than a detriment to this type of road surface; it acts as an expansion joint and allows a certain amount of flexibility under the warping action of heat, and furnishes a mid-line mark to keep passenger traffic in proper lanes.

Yellow on Black.

Yellow on Black.

Yellow on Black.

White on Blue.

An improved form is given below:

Yellow on Black.

Traffic Guides
(From Eno’s “The Science of Highway Traffic Regulation.”)

Widening the roadway before reconstruction has begun will also furnish room for the passage of vehicles. Of course under either of these two last methods the passing vehicles are more or less of a nuisance to the constructor and if a reasonably direct detour entirely away from the work under construction can be maintained in satisfactory condition so much the better. While the traffic must be inconvenienced to some degree by detours the fact that an effort is being made by the road authorities to make the substitute as pleasant as possible will leave a “good taste in the mouth” of the traveling public which is worth while whether that traffic is local or from a distance.