MULTNOMAH COUNTY

Although the assessed valuation of Multnomah County is more than thirty-five per cent of the total assessed valuation of the entire State, this County has renounced all claim to any share of the State Funds available for road purposes, and will construct and maintain in a high state of improvement, at its own expense, all State Roads within its boundaries. This liberal attitude of the people of Multnomah County is to be commended, and it makes available for expenditure in counties outside of Multnomah County, a much greater amount of money than would otherwise be the case.

The roads of Multnomah County represent some of the heaviest grading construction, some of the best improved and some of the most scenic highways to be found anywhere in the world. The Upper Columbia River Highway is by many considered the most scenic highway in the United States, and attracts a multitude of tourists annually.

An interesting tabulation of the amounts expended by Multnomah County in the construction of the Columbia River Highway, both above and below Portland, is appended:

COLUMBIA RIVER HIGHWAY, EAST 82D STREET VIA SANDY ROAD TO
HOOD RIVER COUNTY LINE

SectionMilesPavementGradingBridgesTotal
Sandy Road to
Troutdale
10.29$ 183,001.41$ 5,000.00$ 14,845.33$ 202,846.74
Sandy Cut-off to Auto
Club Bridge
2.4747,506.7494,389.04...141,895.78
Columbia River Highway
to County Line
26.68495,507.75601,012.13169,586.711,266,106.59
Totals39.44$ 726,015.90$ 700,401.17$ 184,432.04$ 1,610,849.11
Total Construction Cost$ 1,610,849.11
Engineering72,004.95
Grand Total$ 1,682,854.06

VISTA HOUSE AT CROWN POINT

Building$ 68,314.36
Retaining Walls and Pavement30,833.69
Total$ 99,148.05

ST. HELENS ROAD, PORTLAND TO COLUMBIA COUNTY LINE
LENGTH, 16 MILES

1915191619171918Totals
Regrade and Macadam...$ 35,330.82$ 16,444.10...$ 51,774.92
Hard Surface$ 80,944.114,111.79200,047.8141,393.37326,497.08
Shoulders...5,081.80......5,031.80
Drainage......5,022.19...5,022.19
Bridges...28,591.3914,203.21...42,794.60
Right of Way and
Miscellaneous
......2,538.06...2,538.06
Engineering,
Superintendence
and Overhead
3,500.003,400.0016,667.872,000.0025,567.87
Total$ 84,444.11$ 76,465.80$ 254,933.24$ 43,393.37$ 459,226.52

SUMMARY

Pavement$ 326,497.08
Bridges42,794.60
Grading64,366.97
Engineering and Overhead25,567.87
Grand Total$ 459,226.52