Railway Notes.
The new track laid in this country during the year ending September 10, 1878, was 1,160 miles. During the six preceding years the number of miles of track laid was: In 1872, 4,498; 1873, 2,455; 1874, 1,066; 1875, 702; 1876, 1,467; 1877, 1,176.
The statement made in the recent Narrow Gauge Convention, that standard gauge freight cars weigh ten tons and carry ten tons, is indignantly disputed by users of the latter. One gentleman, having much to do with freight cars, says that the modern freight cars weigh from 17,000 to 18,000 lbs., commonly carry (and that on long hauls) 28,000 lbs., are guaranteed to carry 30,000 lbs., while he has seen them show on the scales 30,000 and 32,000 lbs. of load, and in one case 35,000 lbs. The general tendency for some years has been to increase loads without increasing, but in many cases decreasing, weights of cars; and it seems quite likely that 30,000 lbs. will soon be the standard load. The tank cars used for carrying petroleum have an average capacity—and they are almost always run full—of 30,000 lbs. The Standard Oil Company, which has some 3,000 of such cars, carried on four-wheeled trucks with the Master Car Builders' standard axle, has run them with such loads for years, and only recently had its first case of a broken axle, manifestly due to a defect in the iron.
Interesting observations have been made recently on the Cologne-Minden Road, Prussia, on the rusting of iron rails. A pile of rails of odd lengths were laid on sleepers over a bed of gravel early in 1870, and remained undisturbed until the fall of 1877, there being no use for them. It was then found that they were covered with a layer of rust 0.12 inch thick, which had to be removed by striking the rail with a hammer. The cleaned rail weighed only 398.2 lbs., while its original weight was 419.1 lbs., showing that 5 per cent. of the rail had been destroyed by rust, which covered the rail quite uniformly. This confirms the observation often made, that rails stacked away are much more liable to rust than those laid down in a track.
According to Le Fer, at a meeting of directors of the German railroads held at Constance, the following information was furnished in regard to the relative value of the different methods of injecting ties:
1. Railroad from Hanover and Cologne to Minden. Pine ties injected with chloride of zinc; after 21 years the proportion of ties renewed was 21 per cent. Beech ties injected with creasote; after 22 years, 46 per cent. Oak ties injected with chloride of zinc; after 17 years, 20.7 per cent. Oak ties not injected; after 17 years, 49 per cent. The conditions were very favorable for experiment; the road bed was good, and permitted of easy desiccation. The unrenewed ties showed, on cutting, that they were in a condition of perfect health.
2. Railroad "Kaiser-Ferdinands-Nord." Oak ties not injected; after 12 years the proportion renewed was 74.48 per cent. Oak ties injected with chloride of zinc; after 7 years, 3.29 per cent. Oak ties injected with creasote; after 6 years, 0.09 per cent. Pine ties injected with chloride of zinc; after 17 years, 4.46 per cent.
The annual official reports of the railroads of India place the length of railways there at 7,551½ miles, of which 492½ miles were completed during the year 1877, and 223 miles since the close of the year. There are 806½ miles of double track; 5,912¾ miles are constructed on the 5 foot 6 inch gauge, and 1,638¾ on narrower gauges. The capital outlay on the State lines amounted to £3,122,051, and on the guaranteed lines to £1,374,882, bringing the total capital expenditure, up to the end of October, as regards the State, and to the end of March last, as regards the guaranteed lines, to £113,144,541. The expenditure up to the end of the year may be taken in round numbers at £13,344,500. The revenue from all the open lines was £6,232,888, of which £6,091,532 were earned by the guaranteed lines, with a capital of £95,482,941, and £141,356 were earned by the State lines, on a capital expenditure of £17,661,600. The net receipts from the guaranteed lines exceeded the amount advanced for guaranteed interest by £1,454,591; the year previous there was a deficit of £216,517.
A French engineer named Duponchel has made a report on the project of a railroad across the Desert of Sahara. The projected railway would run from Algiers to Timbuctoo, a distance of 2,500 kilometers. M. Duponchel stated that the principal portion of the line would rest during nearly its whole extent on layers of sand, and toward the end on primitive volcanic rocks, granite, gneiss, etc. No mountainous obstructions would have to be encountered. The average heat does not appear to exceed 23° or 24° C. (73 2-5° or 75 1-5° Fah.), but account must be taken of the great variations which occur in the 24 hours. For instance, occasionally, a very cold night succeeds a temperature of 40° C. (104° Fah.) in the day time. The great difficulty to be overcome would be the want of water, which is not to be procured in that region. M. Duponchel calculates that for three trains daily the amount of water required would be 4,000 cubic meters, and that the engineering science of the day is quite sufficient to supply even a much greater quantity at the requisite points.
The government of Costa Rica has advertised for tenders for building bridges on the second Atlantic Division of its railroad. There will be needed 194 bridges. The bridges will vary in length from 3 feet to 1,044 feet, and will be built for a track of 3 foot 3½ inch gauge. They will be of sufficient strength to stand a strain of 2,240 lbs. to the lineal foot, in addition to the weight of the usual freight carried.