Fig. 138. Main Girder of the Tree House.

The tree had two large limbs which extended out at a wide angle from the main trunk. Across these two limbs, at about seven feet out, we laid our first girder, nailing it securely in place. Then to the main trunk we nailed the second girder on a level with the first. Diagonal braces were extended from the trunk to support the ends of this girder, and a tie piece was nailed to the braces, as shown in Fig. 138, to prevent them from spreading. The girders were rough sticks about 4 inches in diameter and 10 feet long. We cut flat faces on them at the points where they were nailed to the tree, and then, to make them doubly secured, we nailed cleats, or blocks of

Fig 139. Top View of the Platform. wood, to the tree under them. The floor beams were then laid across and nailed to the girders. They were cut to a length of 10 feet so as to project beyond the outer girder to provide for a piazza overhanging the Goblins’ Platform. Six floor beams were used, spaced 20 inches apart. All branches projecting up between the beams were then cut away and a flooring of slabs was laid on. To the main trunk six feet above the flooring, a stick or (to use the technical term), “wall plate,” was nailed on, and its ends were supported by upright posts resting on the platform. Thirty inches from the outer end of the platform two more posts were erected eight feet high and secured by sticks nailed across from the other posts, and also by a second wall plate connecting their upper ends. Four more posts were erected, one between each pair of the corner posts, and then we were ready to enclose the framing.

Fig. 140. The Frame of the House.

The sidewalls were first clapboarded, because we were afraid the roof would not hold us until the framing had been strengthened by nailing on the siding. Slab boards were used for this purpose. Beginning at the bottom, the boards were laid on, each lapping over the one below, as shown in Fig. 141, so as to shed water. In each side we