2nd Row. Skip 3 single knot sts, s c in s c between knot sts, ** work a double knot st (double knot st: * draw up a ¹⁄₂ inch loop on hook, thread over and pull through loop, s c over single loop of st, repeat from * once), skip 1 s c between knot sts, s c in next s c between single knot sts, repeat from ** across row, work 3 single knot sts to turn each row.

3rd Row. S c in loop to right of s c of next double knot st, s c in loop to left of s c of same double knot st, * double knot st, s c in loop to right of s c of next double knot st, s c in loop to left of s c of same double knot st. Repeat from * across row, work 3 single knot sts, turn and repeat last row until work measures 68 inches or length desired.

EDGE: Work a row of double knot sts all around stole but drawing the loops up 1 inch instead of ¹⁄₂ inch.

Dip in thin starch and block.

Beacon Hill

KNITTED

Materials Required: AMERICAN THREAD COMPANY
“DAWN” PERMANENT “CRIMP SET” NYLON
or
“DAWN” BRAEBURN SPORT YARN
or
“DAWN” SOCK & SWEATER YARN

10 ozs. Pink or color desired.
1 oz. Black.
1 pr. each knitting needles No. 2 and No. 5
Steel crochet hook No. 3.

On No. 2 needles cast on 69 sts and work in ribbing of K 1, P 1 for 4¹⁄₂ inches, increasing 68 sts evenly spaced on last row of ribbing (137 sts). Change to No. 5 needles and work in pattern as follows: