II. The line preparing room for the long flax.
III. One room of spinning machines as a pattern for the rest.
TOW PREPARING ROOM.
A, lap machine; B, 4-feet breaker card; C, 3 feet 6 inches ditto; D, 3-feet finisher card, 3 workers; E, cut tow, second drawing, 5 heads; F, cut tow, first drawing, 4 heads; G, cut tow, reg. roving, 32 spindles; H, 4-feet breaker card; I, 4-feet finisher ditto; K, long tow, first drawing, 3 heads; L, long tow, second drawing, 4 heads; M, long tow, roving 4 spindles.
LINE PREPARING ROOM.