1. The paving of the Octagon and Transepts. The cost of the paving of the Nave has much exceeded the sum anticipated. The completion of this work will cost from £1000 to £2000 additional.

2. The re-paving of the aisles of the Choir, a work of no pressing importance at present, but which will demand great care and consideration whenever it is undertaken.

3. The decoration of the blank space of wall beneath the great East Window, on which there remain some traces of painted figures. If these are found too faint and uncertain for restoration, the space might perhaps be covered with a copy of some appropriate painting in mosaic.

4. The restoration of the exterior of the east end of the Choir. Window shafts to the number of about fifty have disappeared or are broken. The south-east angle turret has been crowned with a pinnacle, but the corresponding turret at the north-east still remains truncated. In the eastern face of the Choir there are twelve niches, which probably were once all filled with figures.

5. The restoration of the Galilee is still very incomplete. The shafts of Purbeck marble, which are so numerous throughout it, require to be repaired or replaced. The niches in the west face, intended for figures, are all empty.

6. The pitch of the roof of the Galilee and of the south-western Transept ought to be raised to give their full effect to the proportions of the great western Tower.

7. The rebuilding of the fallen Transept (north-west) is a work much to be desired, perhaps hardly to be anticipated, yet surely not to be despaired of.

8. The completion of the pinnacles and parapet of the Octagon. This is very important to give full effect to the central portion of the Cathedral, which suffers unduly in estimation from the original design being so imperfectly carried out.

9. Exterior repairs of Trinity Church, formerly the Lady Chapel, which is still under the charge of the Capitular body. The cost of restoring the interior decoration of this elaborate specimen of art, if it be deemed desirable, may be left at present out of calculation.

A generous offer has been made for the interior decoration of the Lantern and vault of the Octagon, which there is every reason to hope will be executed at no distant time.