But when the matter came to be considered by men versed in such concerns, it was seen that a canal with a depth of only seventeen feet of water would not admit of such vessels as those by which alone such a canal could be beneficially used. Passengers, treasure, and light goods can easily be transhipped and carried across by railway. The canal, if made at all, must be made for the passage of large vessels built for heavy goods. For such vessels a canal must hold not less than twenty-five feet of water. It was calculated that a cutting of such depth would cost much more than double the sum needed for that intended to contain seventeen feet—more, that is, than twelve million four hundred thousand pounds. The matter was then abandoned, on the conviction that no ship canal made at such a cost could by any probability become remunerative. In point of time it could never compete with the railway. Colonel Child had calculated that a delay of two days would take place in the locks; and even as regards heavy goods, no extreme freight could be levied, as saving of expense with them would be of much greater object than saving of time.
That this decision was reached on good grounds, and that the project, then, at any rate, was made bonâ fide there can, I believe, be no doubt. In opposition to such a decision, made on such grounds, and with no encouragement but that given by the calculations of an engineer who has himself made no surveys, I cannot think it likely that this new plan will ever be carried out The eloquence even of M. Belly, backed by such arguments, will hardly collect four million eight hundred thousand pounds; and even if it did, the prudence of M, Belly would hardly throw such an amount of treasure into the San Juan river.
As I have before said, there appears to have been no company formed. M. Belly is the director, and he has a bureau of direction in the Rue de Provence. But though deficient as regards chairmen, directors, and shareholders, he is magnificently provided with high-sounding officials. Then again there comes a blank. Though the corps of officers was complete when I was in Costa Rica, at any rate as regards their names, the workmen had not arrived; not even the skilled labourers who were to come in detachments of forty-five by each mail packet. The mail packets came, but not the skilled labourers.
Shortly before my arrival at San José, there appeared in the journal published in that town a list of officers to be employed by M. Felix Belly, the Director-General "De la Compañie Del Canal Atlantico-Pacifico." The first of these is Don Andres Le Vasseur, Minister Plenipotentiary, Veteran Officer of the Guard Imperial, Commander of the Legion of Honour, and Knight of the Order of St. Gregory. He is Secretary-General of the Direction. Then there are other secretaries. In the first place, Prince Polignac, Veteran Officer of the Cavalry of the Cazadores in Africa, &c. He at any rate is a fact! for did I not meet him and the O'Gorman Mahon—Nicodemus and Polyphemus—not "standing naked in the open air," but drinking brandy and water at the little inn at Esparza? "Arcades ambo!" The next secretary is Don Henrique Le Vasseur. He is Dibujador fotografo, which I take to mean photographical artist; and then Don Andres L'Heritier; he is the private secretary.
We next come to the engineers. With reference to geology and mineralogy, M. Belly has employed Don José Durocher, whose titles, taken from the faculty of science at Rennes, the Legion of Honour, &c., are too long to quote. Don Eugénio Ponsard, who also is not without his titles, is the working engineer on these subjects. And then joined to them as adjutant-engineer is Don Henrique Peudifer, whose name is also honoured with various adjuncts.
The engineers who are to be intrusted with the surveys and works of the canals are named next. There are four such, to whom are joined five conductors of the works and eight special masters of the men.
All these composed an expedition which left Southampton on the 17th of February, 1859,—or which should so have left it, had they acted up to M. Belly's promises.
Then by the packet of the 2nd of March, 1859, there came—or at least there should have come, for we are told that they sailed—another expedition. I cannot afford to give all the names, but they are full-sounding and very honourable. Among them there was a maker of bricks, who in his own country had been a chief of the works in the imperial manufactory of porcelain at Sèvres. Having enticed him from so high a position, it is to be hoped that M. Belly will treat him well in Central America. There are, or were, hydrographical engineers and agricultural engineers, master carpenters, and masters of various other specialties.
I fear all these gentlemen came to grief on the road, for I think I may say that no such learned troops came through with the mail packets which left Southampton on the days indicated.
Then by the following steamers there would, it is stated, be despatched in succession an inspector of telegraphs, an engineer for making gas, an engineer to be charged with the fabrication of the iron way, an agriculturist-in-chief, a scientific commission for geology, mineralogy, meteorology, and natural history in general. And attached to all the engineers will come—or now long since should have come—the conductors of works and special masters of men, who are joined with them in their operations. These are to consist principally of veteran soldiers of the Engineers and the Artillery.