THE BEGINNING OF THE NEW NAVY.
“The practical beginning of the new navy occurred under the Administration of Mr. Chandler, and while he was Secretary of the Navy the ‘Chicago,’ ‘Boston,’ ‘Atlanta,’ and ‘Dolphin’ were constructed.
“The hulls of these vessels had been designed by the Advisory Board, and were about equal to any vessels constructed abroad at that time so far, I might say, as the models and general designs were concerned. Their outfit and guns were not fairly up to the prevailing practice abroad, and their engines were very inefficient and commonplace. They were not designed by the board, but were principally the designs of the contractor. The ‘Chicago’ had engines of quite a fantastic design, suggested by one of the members in the board. The models and designs of the hulls, as compared with what had preceded them in the Navy Department after the end of the Civil War, were great achievements over the ridiculous specimens of the ship-building art that we were loaded with during that time. They were the production principally of Messrs. Steers and Fernald, assisted by Mr. Bowles, and were up to most of the requirements of the time.
“When the vessels were tried under the following Administration, that is, during the Secretaryship of Mr. Whitney, it was found that the power of the engines and the consequent speed developed were not up to the requirements of the law, although it might be said that they were up to the requirements of the contract.
“There was some considerable delay on the part of the Secretary, Mr. Whitney, in receiving the ships from the contractors on that particular account, a decision having been made by the Attorney-General that vessels contracted for and subsequently not coming up to the requirements and not in full accordance with the law were worthless, and would not be accepted.
“A violent uproar pervaded the entire country at that time on account of what they called the hesitating attitude of Mr. Whitney.
“The political administration of the government having changed, it was asserted that it was on account of the politics of the contractor that the vessels had not been accepted. Among the people who argued thus, all considerations of contract requirements of law were entirely ignored, and Mr. Whitney received untold denunciations from these sources; but he was one of those men whom adverse criticisms as to what he had done never disturb in the slightest degree.
“Mr. Whitney finally accepted the vessels conditionally, after more or less contention which consumed some little time. But no more unfair denunciation or criticism of the actions and efforts of any man ever occurred than fell to his lot at that time.
“The second lot of vessels was given out by Mr. Whitney, who succeeded Mr. Chandler. Two of these vessels were built on plans provided by Mr. Whitney, and two were on modified plans of Mr. Chandler.
“In compliance with the provisions of the act which authorized the ‘Secretary to prepare drawings,’ Mr. Whitney purchased from Armstrong the drawings that had been prepared for the Spanish government, and the drawings of the ‘Naniwa Khan,’ which ship they had built for Japan. These two vessels became the ‘Baltimore’ and ‘Charleston.’ Cruiser No. 1 of Mr. Chandler’s plans was not given out; as the bids were above the limitation price, the smaller cruiser was given out under modified conditions. This vessel became the ‘Yorktown.’