The wind and tide being now in our favour, by 3.30 a.m. we took to our boat, and arrived on board the Dolphin by 10, when she was very soon got underweigh for the purpose of taking her closer in to ship the horses; light and variable winds, however, prevented our working more than a mile nearer the landing cove by sundown, when we dropped anchor for the night.

22nd October.

With a light west wind the Dolphin was worked into eleven feet water, one and a quarter miles off the point near the cove; the vessel drawing over ten feet, brought the mud up to the surface in our wake. Eight horses were soon swam off without much difficulty, as we all had now some little experience in this sort of work.

EMBARK FOR FREMANTLE.

23rd October.

By 2 p.m. the remaining six horses and equipment of the Expedition were all safely shipped, and a conspicuous intimation of our sojourn on the coast having been painted in large white letters on a pile of granite rocks near the south corner of the cove, we took our final departure, getting the Dolphin underweigh by 4, with a light westerly wind, which carried us through the passage between Hauy and Delambre Islands by 7, when we hauled up and stood to north-north-west.

24th October.

The wind still holding to the west, we made but little progress, the Dolphin being only a good sailer in smooth water, or running before the wind.

Latitude 19 degrees 12 minutes south at noon.

25th October.