Transportation and Disposal.

The track on the surface and in the tunnels was of 20-lb. rails on a 2-ft. gauge.

The excavation was handled in scale-boxes carried on flat cars, and the concrete in 1¼-cu. yd. mining cars dumping either at the side or end.

PLATE XXXV.
TRANS. AM. SOC. CIV. ENGRS.
VOL. LXVIII, No. 1155.
HEWETT AND BROWN ON
PENNSYLVANIA R. R. TUNNELS: NORTH RIVER TUNNELS.

TABLE 17.—Cost of Conduit Work.

Manhattan.Weehawken.Total.
Duct feet115,96235,155151,117
Average Cost per Duct Foot.
Labor$0.035$0.032$0.034
Material0.0430.0520.045
Total field charges0.0780.0840.079
Chief office and plant depreciation0.0050.0080.006
Total average cost$0.083$0.092$0.085