In a general way, the location of high earth dams is governed by the configuration of the ground forming the storage basin. It may not be possible, however, to decide upon the best available site without careful preliminary surveys and examinations of the geological formation.

All earth dams must be provided with a wasteway, ample to discharge the maximum flood tributary to the reservoir. Whatever type of wasteway be adopted, no reliance should ever be put upon the outlet pipes for this purpose. The outlet should only figure as a factor of safety for the wasteway, insuring, as it were, the accuracy of the estimated flood discharge. The safety of the dam demands that ample provision be made for a volume of water in excess of normal flood discharge. This most necessary adjunct of earth dams may be an open channel, cut through the rim of the reservoir basin, discharging into a side ravine which enters the main drainage way some distance below the dam. It may be necessary and possible to pierce the rim by means of a tunnel where its length would not prohibit such a design. Lastly, there may be no other alternative than the construction of an overfall spillway, at one or both ends of the embankment. This last method is the least desirable of any and should be resorted to only when the others are impracticable; even then, the volume of water, local topography, geology, and constructive materials at hand must be favorable to such a design. If they are not favorable it may be asked, “what then?” Simply do not attempt to build an earth dam at this site.

PHYSICAL FEATURES, MATERIALS, ETC.–An investigation of the location and the physical features of the dam site should include a careful and scientific examination of the materials in the vicinity, to determine their suitability for use in construction. An earth embankment cannot be built without earth, and an earth dam cannot be built with safety without the right kind of earth material.

Test pits judiciously distributed and situated at different elevations will indicate whether there is a sufficient amount of suitable material within a reasonable distance of the dam. The type of earth dam best suited for any particular locality, and its estimated cost, are thus seen to depend upon the data and information obtained by these preliminary studies. Economical construction requires the use of improved machinery and modern methods of handling materials, but far more important even than these are the details of construction.

FOUNDATION.–We may now assume that our preliminary studies relating to the location and physical features of the dam site are satisfactory. We must next investigate the foundation upon which the dam is to be built. This investigation is sometimes wholly neglected or else done in such a way as to be practically useless. To merely drive down iron rods feeling for so-called bed rock, or to make only a few bore-holes with an earth auger should in no instance be considered sufficient. Borings may be found necessary at considerable depths below the surface and in certain classes of material, but dug pits or shafts should always be resorted to for moderate depths and whenever practicable. Only by such means may the true character of the strata underlying the surface, and the nature and condition of the bed rock, if it be reached, become known. If a satisfactory stratum of impermeable material be found it is necessary also to learn both its thickness and extent. It may prove to be only a “pocket” of limited volume, or if found to extend entirely across the depression lengthwise of the dam site it may “pinch out” on lines transversely above or below. Shafts and borings made in the reservoir basin and below the dam site will determine its extent in this direction, knowledge of which is very important.

[Fig. 1], showing a longitudinal section of the site of the Yarrow Dam of the Liverpool Water-Works, England, illustrates the necessity of such investigation. A bore hole at station 2 + 00 met a large boulder which at first was erroneously thought to be bed rock. The hole at station 3 + 50 met a stratum of clay which proved to be only a pocket.

The relative elevation of the different strata and of the bed rock formation, referred to one common datum, should always be determined. These elevations will indicate both the dip and strike of the rock formation and are necessary for estimating the quantities of material to be excavated and removed, including estimates of cost. They furnish information of value in determining the rate of percolation or filtration through the different classes of material and the amount of probable seepage, as will appear later. The cost of excavating, draining and preparing the floor or foundation for a dam is often very great, amounting to 20 or 30% of the total cost.

[Fig. 2] is a transverse section of the Yarrow Dam. This particular dam has been selected as fairly representative of English practice and of typical design. It is one of the most widely known earth dams in existence.

FIG. 1.–LONGITUDINAL SECTION OF YARROW DAM SITE.