The Civil Works grant was nearly £350,000.

The provinces had no court-houses, no jails, no places of detention at the police stations, and no barracks or accommodation for the military police. Two larger jails, one at Mandalay for eight hundred prisoners and one at Myingyan for one thousand, although not yet completed, were already occupied. Of three smaller prisons at Monywa, Pagan, and Minbu, one was finished and two partially, but enough to be of use. At ten stations small lock-ups were being built for persons arrested by the police. The jails and lock-ups were pressed on, because the existing arrangements for confining prisoners inherited from the Burmese Government were insufferable, and in some cases inhuman.

Provision had to be made for housing some thousands of military police. At the headquarters of eighteen districts accommodation had to be provided for about half a battalion, with hospitals, guard-rooms, magazines, and cook-houses. These buildings, especially the hospitals with accommodation for 8 per cent. of the strength, were constructed of good permanent material. The barracks, officers' quarters, stables, and the like were built in the cheapest way consistent with comfort and health. The condition of the country in a year or two would permit, it was expected, of a reduction of the military police force, or at least of a change in its disposition; the barrack accommodation would not be permanently wanted, but the hospitals could be used for the civil population.

Added to all this building work, roads to the extent of five hundred miles, of which one hundred and fifty were hill roads, were laid out and made passable, raised and bridged in most cases, and in some places metalled. These works were scattered over the province from Bhamo to the old frontier of British Burma. In designing the roads it was remembered that the great trunk lines of communication were the great rivers in the centre and west of the province, and the railway in the east. All the main roads were designed to be feeders to the rivers or the rails. In addition to the larger roads, many hundreds of miles of tracks and rough district roads were cut through the forest and jungles, and a survey was begun, to open up the difficult Yaw country, through which we had afterwards to push troops. (vide Chapter XXI.). I think it may be claimed that our engineers did their duty.

The middle of Upper Burma, the dry zone, as it is called, differs in climatic conditions from the country to the south and north of it. The rainfall is deficient, and droughts, sometimes severe, are not unknown.

The Burmese rulers were capable of large conceptions, but they lacked skill; and their great irrigation schemes, attempted without sufficient science, were foredoomed to failure. The largest works of this class existing, when we took the country, were the Mandalay and Shwèbo Canals, which were of little use, as even where the construction was not faulty they had been allowed to go to ruin. In Kyauksè Salin (Minbu district) and elsewhere there were extensive canals of a less ambitious nature, which although neglected were still of much service. Even in the turmoil of 1886 and the pressure of what was in fact a state of war, Sir Charles Bernard found time to attend to the irrigation systems; and as soon as a skilled engineer could be obtained from India, and funds allotted, the work of irrigation was tackled in earnest. The first business was to examine the existing systems and see whether they could be made use of. Before I left Burma in December, 1890, I had the pleasure of knowing that this work was in hand, and that further deterioration from neglect had been stopped, and also that new schemes were under consideration.

The expenditure in Upper Burma at this time was very great. An army of fourteen thousand men cannot be kept in the field for nothing. The military police force was a second army, and there was besides all the cost of the civil administration. The incoming revenue was in comparison insignificant. In 1886-7 it had been £250,000 in round numbers, in 1887-8 it rose to £500,000—not enough to cover the public works expenditure alone.

It was not wonderful, therefore, that the Government of India, whose finances at the time were by no means happy, should be nervous about the expenditure. They were most gentle and considerate in the matter; and although it was evident that our success in Burma would be measured in England mainly by the financial results, no pressure was put upon me to get in revenue, and I felt the pinch chiefly in the difficulty of getting an adequate and competent engineering establishment and immediate funds for works, the urgency of which was less apparent to the Government of India than to me on the spot. With Lord Dufferin's backing I obtained what I wanted, and I hope I did not exhibit an indecent importunity.

I had considered and reported to the Finance Department all possible means of raising the revenue. On the whole, my conclusion was that we had to look rather to existing sources than to new taxation, which in a country not yet completely subdued and of which we had imperfect knowledge would have been inexpedient. The excise revenue might have been made profitable, but we were debarred from interfering for the time with the regulations made and sanctioned (somewhat hastily, perhaps) by the Government of India, immediately after the annexation.

Under the circumstance, the best and quickest method of improving the financial conditions was clearly the reduction of the field force. This was already under discussion. The initial step had been taken and one regiment of Native Infantry had been sent back to India. The military police had begun to relieve the troops in the outposts. The Major-General, Sir George White (who in addition to his merits as a gallant leader and good strategist, was an able administrator), was careful always of public money, and in perfect accord with the civil administration. He desired his men to be relieved as quickly as possible.