Then the entrance and halls and staircases, as originally sketched, will be often found unnecessarily large when tested by library requirements. At Brookline the larger part of the saving was made on such extras. Outside steps, platform, columns, cornices, balustrades and the like, are often superfluous.

On material, again, much permissible saving can be made. Inquiry of the architect will elicit that less expensive material or finish will give as much strength, durability and also as good effect as the first choice.

“Shingles instead of slate, plain glass instead of plate glass, cheaper brick, cheaper finish, omitting fireplaces, using wood floors instead of tile.”—Miss Marvin.[92]

“Don’t waste money in too substantial construction and fireproofing.”—Stanley.[93]

When the inquiry is made of him, the architect will usually prove to be suggestive as to economies. He will be much more interested in savings than in extravagance, and he knows just where savings can be made without real sacrifice of strength, utility, or beauty. In fact, it is here and in suggestion of alternatives in meeting library needs, that a practical architect will often surprise the librarian.

Indeed, I have been surprised myself in finding how keen an architect can be when this question comes up. One would think he would hate not only to forego any of his commission, but also to give up what seem to be essential elements in a harmonious scheme. But in all economies of this kind in which I have taken part, the architect has thrown himself into problems of saving with as much zeal as if he were to benefit rather than the owner.

Open Access

The admission of readers freely to the shelving, both readers who want to select books to borrow for home-reading, and those who wish to select from the shelves books for serious reading in the building, has become a common policy of libraries under the name of “open access.”