But it splashed and slobbered enormously in the ladle at this juncture; a few hundred pounds ran over the edge to the floor of the pit. This, when it had cooled a little, it would be our job to clean up, separating steel scrap from the slag, and putting it into boxes for remelting.

When a ladle was full, the crane took it gingerly in a sweep of a hundred feet through mid-air, and, as Fritz said, the men on the pouring platform released a stopper from a hole in the bottom, to let out the steel. It flowed out in a spurting stream three or four inches thick, into moulds that stood some seven feet high on flat cars.

"Clean off the track on Number 7, an' make it fast," from the pit boss, accompanied by a neat stream of tobacco juice, which began to steam vigorously when it struck the hot slag at his feet.

We passed through to the other side of the furnaces, by going under Number 6, a bright fall of sparks from the slag-hole just missing the heels of the last man.

"Isn't that dangerous and unnecessary?" I said to myself, angrily. "Why do we have to dodge under that slag-hole?"

We moved in the dark along a track that turned in under Seven, into a region of great heat. Before us was a small hill of partially cooled slag, blocking the track. It was like a tiny volcano, actively fluid in the centre, with the edges blackened and hard.

I found out very quickly the why of this mess. The furnace is made to rock forward, and spill out a few hundred pounds of the slag that floats on top. A short "buggy" car runs under, to catch the flow. But somebody had blundered—no buggy was there when the slag came.

"Get him up queek, and let buggy come back for nex' time," explained an Italian with moustachios, who carried the pick. "Huh, whatze matter goddam first-helper, letta furnace go?" he added angrily. "Lotza work."

This job took us three hours. The Italian went in at once with the pick, and loosened a mass of cinder near one of the rails. Fritz and I followed up with shovels, hurling the stuff away from the tracks.

The slag is light, and you can swing a fat shovelful with ease; but mixed with it are clumps of steel that follow the slag over the furnace doors. It grew hotter as we worked in—three inches of red heat, to a slag cake six inches thick.