“Now, then,” said he, “I built this embankment, and I'll tell you whether it is going to burst or not.”

Then he took a lantern, and was going to inspect the crack himself; but Mr. Carter, respecting his courage and coolness, would accompany him. They went to the crack, examined it carefully with their lanterns, and then crossed over to the waste-wear; no water was running into it in the ordinary way, which showed the dam was not full to its utmost capacity.

They returned, and consulted with Mountain.

Ransome put in his word, and once more remembering Little's advice, begged them to blow up the waste-wear.

Tucker thought that was a stronger measure than the occasion required; there was no immediate danger; and the sluice-pipes would lower the water considerably in twenty-four hours.

Farmer Ives put in his word. “I can't learn from any of you that an enlarging crack in a new embankment is a common thing. I shall go home, but my boots won't come off this night.”

Encouraged by this, Mr. Mountain, the contractor, spoke out.

“Mr. Tucker,” said he, “don't deceive yourself; the sluice-pipes are too slow; if we don't relieve the dam, there'll be a blow-up in half an hour; mark my words.”

“Well,” said Mr. Tucker, “no precaution has been neglected in building this dam: provision has been made even for blowing up the waste-wear; a hole has been built in the masonry, and there's dry powder and a fuse kept at the valve-house. I'll blow up the waste-wear, though I think it needless. I am convinced that crack is above the level of the water in the reservoir.”

This observation struck Ransome, and he asked if it could not be ascertained by measurement.