During these experiments, men were stationed at the inlet of the pipe, at its outlet on the summit of the Virginia range, and at various points through the valley, as lookout men. They made their signals by means of a smoke during the day, and a fire by night—a trick learned from the Piute Indians.

As the water came surging down through the great inverted siphon from the elevated mountain spur, and began to fill and press upon the parts lying in the deeper portions of the valley, one after another the blow-off cocks on the crests of the ridges crossed, opened, and allowed the escape of the compressed air. Compared with what was heard when these cocks blew off, the blowing of a whale was a mere whisper. The water finally flowed through the pipe and reached Gold Hill and Virginia City on the night of August 1, 1873. Early that evening a signal fire was lighted in the mountains at the inlet of the pipe, showing that the water had again been turned on.

As the pipe filled, the progress of the water in it could be traced by the blowing off of the air on the tops of the ridges through the valley, and at last, to the great joy of the engineer and all concerned in the success of the enterprise, the signal fire at the outlet, on the summit of the Virginia range, was for the first time lighted, showing that the water was flowing through the whole length of the pipe.

When the water reached Virginia there was great rejoicing. Cannon were fired, bands of music paraded the streets, and rockets were sent up all over the city. Many persons went out and filled bottles with this first water from the Sierras, and a bottle of it is still preserved in the cabinet of the Pacific Coast Pioneers.

Previous to the laying of this pipe for the Virginia and Gold Hill Water Company, the greatest pressure under which water had ever been carried in any part of the world was 910 feet. This was at Cherokee Flat, California, and was also under the supervision of Mr. Schussler.

In 1875, the Virginia and Gold Hill Water Company laid a second pipe alongside of the first. This has an inside diameter of ten inches. Instead of being fastened with rivets it is lap-welded, and is the largest pipe ever made in that way. As there are no rivet-heads in it to produce friction, it delivers the same amount of water as the larger pipe, namely, 2,200,000 gallons per twenty-four hours.

GOLD HILL—LOOKING NORTH.

Previous to 1875, the supply of water was principally obtained from a stream known as Hobart Creek, but, in the year named, the works in the mountains were extended by pushing the supply flume through to Marlette Lake, within the basin of Lake Tahoe, a distance of eight and a half miles, and a total distance from Virginia City of thirty-one and a half miles. In order to reach and tap Marlette Lake it was necessary in one place to run a tunnel 3,000 feet in length under a dividing ridge—the ridge forming the rim of the Lake Tahoe basin. Marlette Lake covers over 300 acres of ground, and in the middle is 30 or 40 feet in depth.

Connected with the works are several reservoirs that hold from three million to ten million gallons of water. Signal fires are no longer necessary along the line of the works, as there is now set up a line of printing telegraph, with numerous stations between Virginia City and Marlette Lake. Marlette Lake lies at an altitude of 1,500 feet above C street, Virginia City, and the water is brought in at such a height above the town that it can everywhere be carried far above the highest buildings, and streams from the hydrants are thrown with great force and effect in case of a fire occurring near them.