A pitch is prepared of rosin and grease, in such proportions that it will neither readily crack in cold water nor melt in the sun. One or the other ingredient is added until by test it is found just right.

Patching and Pitching

The canoe is now placed on the ground, right side up, and all holes are covered on the inside with thin birch bark that is pasted down with hot pitch. A strip of cloth is saturated with hot pitch, and pressed into the cracks on either side of the bow-piece inside, between the bark and the bow-piece ([Fig. 99]).

Figs. 97-100.—Show details of canoe bow.

The thin longitudinal strips are next laid in position, edge to edge, lapping several inches by the middle; they are whittled thin here so as to lap evenly.

The ribs are next tightly driven in place, commencing at the small end ones and working toward the middle. The end ribs may be two or three inches apart, being closer toward the middle, where, in many cases, they touch. Usually, they are about half an inch apart in the middle. Each rib is driven into place with a square-ended stick and a mallet.

The ends are stuffed with shavings ([Fig. 100] and "Section" [Fig. 100½]), and an oval cedar board is put in the place formerly occupied by the post that supported the end of the frame. The lower end rests in the notch of the bow-piece, while the upper is cut with two shoulders that fit underneath each side of the frame; [Fig. 97] shows the cedar board.