Lifting Hitch
(Fig. 4.) Hitch formed ready to tighten.
Draw loose end of running rope forward and from under standing rope at top of pack. The effect of operations thus far is this: The running rope passes up the near side, from hook and to top of load and passes under standing rope, which will serve effectually in final tightening of cinch to hold slack.
Pass end of running rope over and under the forward end of off pack and backward under standing rope and pack. Now bring the rope forward over side of pack, double, and thrust the doubled portion over and under forward rope in a bight. With left hand grasp double of rope at bight just to rear of forward rope where it passes over and under forward rope, and with right hand slip running rope down and just to rear of standing rope. Take up slack. By pulling hard upon loose end of running rope the ends of pack will be lifted slightly.
Throw loose end over horse to near side, and across middle of load. Pass to near side and manipulate rope as on off side. Tighten load. Secure the hitch by bringing loose end of rope over and under forward running and standing ropes, and tie.
STIRRUP HITCH
This hitch is useful where the packer has lash rope but no cinch, and may be employed on sawbuck saddle, aparejo, or where the load is hung upon an ordinary riding saddle. It is a two-man hitch, though one man may manipulate it.