When unloading on curves the operations are delayed by the necessity of using snatch blocks on the cars to insure a nearly tangential pull of the cable and avoid pulling the plow off the car. These blocks are applied as shown in [Fig. 90], and at A, [Fig. 91]. They are hooked to long chains extending over the car and fastened to the bolster or arch bar of the truck. The number of snatch blocks required depends upon the degree of the curve and the length of the cable; generally four to six blocks, one to every third car, are enough. As the plow approaches one of these blocks it must be stopped, block and chain removed and transferred forward for use at that end of the train. The other operations of unloading are the same as when on straight track. The time required in unloading on curves varies from 20 minutes to an hour, and averages about 40 minutes, doing as much work in that time as 20 men can do in a day.
The steel wire cables used vary from 1 in. to 1½ ins. diameter. The former are used for unloading loose gravel and sandy material; they are light and easily handled, but cannot bear much jerking. The most usual size is 1¼ ins. diameter. Heavier cables require too many men (six to eight) to load them on the car preparatory to starting the plow.
One of the heaviest locomotives on the road (preferably one of the consolidation type) should be used for drawing the plow over the cars. These engines are generally able to keep the plow moving with a strong steady pull, avoiding the necessity of taking a run to start the plow, and all injurious jerking of the cable, which frequently breaks it. For tenacious materials and where the haul is not more than 25 miles, it is often good policy to keep one heavy engine at this work, the other engines merely hauling the trains; this can generally be arranged so that no more engines are used than if each engine were to unload its own train. Sometimes two light engines are used for this purpose, but they can seldom move in perfect unison and more or less jerking is the result. Unfortunately the engines for the "mud trains" are not always in the best working order; they are mostly those which are about to go into the shops for turning down the tires or for general repairs, and are not in fit condition for general traffic, but still considered good enough for this service. Expensive delays due to badly working engines are frequently the result.
The locomotive in the steam shovel pit should always be equipped with a steam or air driver brake to assist in quickly stopping the cars at exactly the right place when setting them for loading by the steam shovel. For the same reason the brakeman should be allowed to use short sticks in the brake-wheels to obtain a greater leverage in turning them.
Both engine and train crews should be changed as little as possible and they should retain their respective trains in the pit on the road or at the dump. Most of the men dislike the "mud train" service, but some (especially the older ones) are glad to get a steady job with a full night's rest, and these are the men to be chosen. They take an interest in the success of the work, and soon acquire an expertness in handling cars, plows, etc., that makes them worth twice as much as the inexperienced or unwilling ones. The wages of these men should be equalized to average the same as the men on the road in other service, otherwise dissatisfaction and indifference are sure to result.
Fig. 92.
The machine shown in [Fig. 92] has lately come into use for pulling the plow over the cars to unload them. This is merely a double cylinder (10 by 12 ins.) reversible hoisting engine, resting on a heavy cast iron bedplate attached to the floor of a box car. Steam is supplied to the engine from the locomotive of the train, which is coupled to this car when the unloading is to begin. With this machine there is no injurious jerking of the cable, and consequently very little breakages or delays, and heavy loads of 15 cu. yds. of tenacious material are readily plowed off the cars in a more satisfactory manner than can be done by any one or two locomotives. Blocking the wheels or chaining cars to the track need not be resorted to; the cars cannot move, for the machine pulls the plow toward itself and the strain is resisted by the cars between them. If it is desired to scatter small quantities of material along the track, as it is often wanted in surfacing or raising track, both plow and train are moved in the same direction at the same or varying speeds, as may be necessary to unload the required amount of material. If a large quantity of material is wanted within a short distance, as usually happens on washouts, train and plow are moved in opposite directions. By moving them in this manner at the same speed, a whole train can be unloaded at any desired spot. Where two locomotives must be used to pull the plow over the cars, the use of this machine will dispense with one of them, and do the work in half the time. On large jobs it should not be missing. The cable is wound around the drum, A, [Fig. 92], and must be long enough to extend over the whole length of the train. A steel wire cable 1-1/8 ins. diameter is generally used; but for loose gravel a 1 in. cable is amply strong enough.
The steam shovel can be operated continuously throughout the year in all kinds of weather, though operations are often suspended in extremely cold weather. When working in cold weather the face of the bank sometimes freezes during the night to the depth of 3 to 6 ins., but this crust is easily broken in the morning by a few small charges of powder, and then the material can be excavated as easily as at any other season.