One spunge to be placed on the right of the mortar, the spunge head to the front, and supported to keep it free from gravel.
One scraper for two mortars.
One cartridge case, for bringing up the cartridge; or a paper or leather case, for loading when the powder is loose.
One beam hook, for 13-inch; One pair of hand hooks, for 10-inch.
One new pattern hand hook, or piece of cord, for 8-inch.
Four handspikes. Two on each side of the platform, as directed for guns.
Two pointing rods, or pickets.
One plummet with line, in charge of No. 1.
A piece of sheepskin, or an empty sand-bag for wiping the bottom of the shell; to be placed on the right of the spunge.