In January 1916 a machine-gun company of sixteen guns was affiliated to each brigade. These companies were formed by the amalgamation of the four battalion machine-gun sections in each brigade, Captains Hardie, Calder, and Board commanding the companies of the 152nd, 153rd, and 154th Infantry Brigades respectively.

In the early part of 1916 the trench-mortar situation was greatly improved. Three 2-inch trench-mortar batteries were formed by the Divisional artillery. These mortars fired the 60-pound bomb already described known as the “Donald Dinnie.” They were still considerably inferior to the German trench-mortars in range, but they constituted a considerable advance on all previous experiments. Their chief faults lay in their liability to misfire, and in their frequent inaccuracy, due to the boxes containing the component parts not being water-tight.

When the “Donald Dinnie” did burst on its target, the effect was gratifying. The retaliation they almost invariably drew from the enemy was the best evidence of their efficacy, and made the duty of serving the mortars an extremely hazardous one.

In May 1916 a light trench-mortar battery, consisting of four Stokes mortars, was formed for each brigade. The Stokes gun proved the most satisfactory British light trench-mortar invented, and remained the weapon of the light trench-mortar batteries throughout the war.

On 1st March 1916 orders were received for the Division to march northwards and take over from the 23rd French Division of the XIIme Corps d’Armée in a sector north of Arras, now known to history as the Labyrinth. This move was due to the necessity for the British to take over more line from the French. The object was to free as many French Divisions as possible for the defence of Verdun, against which the German was delivering his great attack.

Preliminary reconnaissances of the new line by senior commanders and their staffs began on 3rd March. The first troops moved off to the new area on 6th March. During the march, the Division staged in the Beauval-Candas area and the Frevent area. Finally, Divisional headquarters opened on 12th March at Duisans, General Harper taking over command of the line at 8 A.M. on that date.

The march to the new area is chiefly memorable to those who took part in it from the fact that much of it was carried out in a blinding snowstorm, with all its attendant discomforts.

The cold was intense, and was severely felt by parties proceeding to carry out preliminary reconnaissances in motor lorries and by the troops as they arrived each night in new billets.

The Division, after its six weeks period of rest and training, was at the top of its form, and presented a most soldierly appearance. It had profited considerably from its training, in spite of the fact that it had been handicapped by spells of bad weather.

This was the last period of rest of more than ten days’ duration which the Division was to have until the following January.