"Your well-wisher,
"Henry Harvey.

"Mr. Rd. Trevithick, Camborne."

Mr. Harvey knew Trevithick's weakness in money matters. Rennie had been employed to report on the proposed Plymouth Breakwater, and in 1811 was desired by Lord Melville, the head of the Admiralty, to proceed with the work. "The price paid in 1812 for taking and depositing rubble in the breakwater was 2s. 9d. per ton; it was afterwards reduced to 1s. per ton. A piece of ground was purchased from the Duke of Bedford at Oreston, up the Catwater, containing 25 acres of limestone, well adapted for the purposes of the work; and steps were taken to open out the quarry, to lay down railways to the wharves, to erect cranes."[6] The idea of the plan to be followed in conveying stone with greater economy and dispatch than was contemplated by Rennie, originated with Trevithick, while the former received the credit and the pay, as he before had done with the steam-dredger.

[Rough draft.]

"Mr. Fox Jun.,

"Camborne, January 29th, 1813.

"Sir,—Since I was at Roskrow I have been making trial on boring lumps of Plymouth limestone at Hayle Foundry, and find that I can bore holes five times as fast with a borer turned round than by a blow or jumping-down in the usual way, and the edge of the boring bit was scarcely worn or injured by grinding against the stone, as might have been expected. I think the engine that is preparing for this purpose will bore ten holes of 2½ inches in diameter 4 feet deep per hour. Now suppose the engine to stand on the top of the cliff, or on any level surface, and a row of holes bored, 4 feet in from the edge of the cliff, 4 feet deep, and about 12 inches from hole to hole for the width of the piece to be brought down at one time, and wedges driven into the holes to split the rock in the same way as they cleave moorstone, only instead of holes 4 inches deep, which will cleave a moorstone rock 10 feet deep when the holes are 14 or 15 inches apart, the holes in limestone must go as deep as you intend to cleave out each stope, otherwise the rock will cleave in an oblique direction, because detached moorstone rocks have nothing to hold them at the bottom, and split down the whole depth of the rock. In carrying down a large piece of solid ground the bottom will always be fast, therefore unless it is wedged hard at the bottom of the hole the stope cannot be carried down square. In a hole 2½ inches diameter and 4 feet deep put in two pieces of iron, one on each side of the hole, having a rounded back, then put a wedge between the two pieces, which might be made thus, if required to wedge tighter at the bottom of the hole than at the top.

"If this plan answers, the whole of the stones would be fit for service, even for building, and would all be nearly of the same size and figure. Each piece would be easily removed from the spot by an engine on a carriage working a crane, which would place them into the ship's hold at once. It would all stand on a plain surface, and might be had in one, two, three, or four tons in a stone, as might best suit the purpose, which would make the work from beginning to end one uniform piece. Steam machinery would accomplish more than nine-tenths of all the work, besides saving the expense of all the powder. I find that limestone will split much easier than moorstone, and I think that a very great saving in expense and time may be made if the plan is adopted.

"Please to think of these hints and write me when and where I may see you to consult on the best method of making the tools for this purpose before I set the workmen to make them. Any day will suit me, except Monday, the 8th of February. The sooner the better, as I cannot set to work to make the tools until we have arranged the plan.