A few comparisons outside of the construction itself will serve to illustrate the tremendous proportions of the work. Paper money was not handled at all in paying off the canal army. It took three days to pay off the force with American gold and Panaman silver. When pay day was over there had been given into the hands of the Americans, and thrown into the hats of the Spaniards and West Indian negroes, 1,600 pounds of gold and 24 tons of silver. When it is remembered that this performance was repeated every month for seven years, one may imagine the enormous outlay of money for labor.
The commissary also illustrates the magnitude of the work. Five million loaves of bread, a hundred thousand pounds of cheese, more than 9,000,000 pounds of meat, half a million pounds of poultry, more than a thousand carloads of ice, more than a million pounds of onions, half a million pounds of butter—these are some of the items handled in a single year.
Wherever one turns he finds things which furnish collateral evidence of the magnitude of the work. The Sanitary Department used each year 150,000 gallons of mosquito oil, distributed thousands of pounds of quinine, cut and burned millions of square yards of brush, and spent half a million dollars for hospital maintenance.
No other great engineering project has allowed such a remarkable "margin of safety"—the engineering term for doing things better than they need to be done. The engineers who dug the canal took nothing for granted. No rule of physics was so plain or so obvious as to escape actual physical proof before its acceptance, when such proof was possible. No one who knows how the engineers approached the subject, how they resolved every doubt on the side of safety, and how they kept so far away from the danger line as actually to make their precaution seem excessive can doubt that the Panama Canal will go down in history as the most thorough as well as the most extensive piece of engineering in the world.
CHAPTER III
GATUN DAM
The key to the whole Panama Canal is Gatun Dam, that great mass of earth that impounds the waters of the Chagres River, makes of the central portion of the canal a great navigable lake with its surface 85 feet above the level of the sea, and, in short, renders practicable the operation of a lock type of canal across the Isthmus.
Around no other structure in the history of engineering did the fires of controversy rage so furiously and so persistently as they raged for several years around Gatun Dam. It was attacked on this side and that; its foundations were pronounced bad and its superstructure not watertight. Doubt as to the stability of such a structure led some of the members of the Board of Consulting Engineers to recommend a sea-level canal. Further examination of the site and experimentation with the materials of which it was proposed to construct it, showed the engineers that it was safe as to site and satisfactory as to superstructure. The country had about accepted their conclusions, when, in the fall of 1908, there was a very heavy rain on the Isthmus, and some stone which had been deposited on the soil on the upstream toe of the dam, sank out of sight—just as the engineers expected it to do. A story thereupon was sent to the States announcing that the Gatun Dam had given way and that the Chagres River was rushing unrestrained through it to the sea. The public never stopped to recall that the dam was not yet there to give way, or to inquire exactly what had happened, and a wave of public distrust swept over the country.