Diagram showing the distribution of automobiles coming in town on Grant Boulevard
Only one other thoroughfare problem is involved with the "Hump Cut," that of Grant Boulevard extension. Since the grade of Webster Avenue will be considerably lowered in connection with the "Hump Cut," and the buildings along its lower end greatly damaged in any case, by far the best plan for Grant Boulevard is to carry it straight through to Webster Avenue and to widen the lower end of the latter to 60 feet, as far as Grant Street. The widening of Oliver Avenue to 50 feet between Grant and Smithfield Streets, and the possible widening of Strawberry Way, would, together with existing streets, provide adequate means of distribution for the large number of automobiles using the boulevard, and would at the same time create a decided local improvement.
A Civic Center
The location of a Civic Center, where the city offices can be grouped in a convenient and dignified manner, ought to connect with the main transportation lines. It ought, if possible, to embrace the county buildings. It ought, if possible, to occupy land which is not of such high cost as to preclude the setting apart of the open space which is requisite to the highest dignity and beauty of public buildings. All these advantages are embraced to a high degree in a locality now so unpromising and unattractive that it is hard not to feel an unfair prejudice against it.
County Buildings—the northwest side of the proposed Civic Center
Present appearance of the Civic Center site from the rear of the County Buildings