INTRODUCTION

March 15th, 1910, upon recommendation of the Committee on City Planning, the Pittsburgh Civic Commission authorized Colonel Thomas W. Symons, Corps Engineers, U. S. A. retired, and Mr. Frederick Law Olmsted to make a report upon desirable heights and pier locations for bridges over the Allegheny River. The purpose of the Commission was to secure a report which weighed the interests of all parties to the bridge question, and which would strike a balance to meet the various transportation needs of Pittsburgh.

The Commission asked the Committee on City Planning to direct the preparation of the report. The Committee consists of T. E. Billquist, chairman; Charles F. Chubb, H. J. Heinz, Benno Janssen, Richard Kiehnel, E. K. Morse. This committee passed upon the report April 18th and recommended it to the Commission for adoption. On April 25th the Commission received and adopted the report and voted their hearty appreciation of the work of Colonel Symons, Mr. Olmsted and the Committee on City Planning. This report was published separately in May 1910.

RECOMMENDATIONS

1. That the Sixteenth Street and Forty-third Street bridges, which are obstructions to navigation on account of their pier locations, narrow channels, and exceptionally low clearance height, be required to be rebuilt with their piers so located as to give channels conforming to the neighboring bridges, and that their elevation be fixed with regard to eliminating the railroad grade crossings on their approaches, but the minimum clearance shall be fixed in accordance with the closing paragraph below.

2. That the Ninth Street bridge should be rebuilt as soon as practicable with a central pier and two wide spans conforming to those of the Sixth Street and Seventh Street bridges. The design of the new Ninth Street bridge, however, should not be finally determined and erection begun until a definite plan for comprehensive improvements in the traction system between the two sides of the river has been decided upon. Unless new circumstances develop before the construction of this bridge is begun that materially affect the problem of clearance height, the elevation should be fixed in accordance with the closing paragraph below.

3. That all questions pertaining to changing the elevation of the Sixth Street, Seventh Street, Fort Wayne, Thirtieth Street and Junction Railroad bridges be deferred to await the report of the Pittsburgh Flood Commission and the resultant action; to await the report on a comprehensive plan for traction improvements; to await the completion of the work projected by the City in cutting down some streets and filling others; and to await the results of the investigation of river boat design and construction provided for in the River and Harbor bill just passed by Congress.

4. That if it is deemed essential and necessary at present to decide upon the elevation to which all Allegheny River bridges must be made to conform, this elevation be fixed so that there shall be a clear head room of substantially 37 feet above pool level, varied so as to give at each bridge a clear head room of 28 feet when the river is at a 15 foot flood stage. This height to be maintained over the entire main span where there is a central span and for 180 feet on each side of the central pier where there is a central pier.

FULL REPORT