As the haul increases, the number of vehicles of transport remaining the same, the number of excavators must decrease. Earths easily removed do not admit of so large a haul, with a given number of excavators, as hard earths. The nature of the ground, form of carts, kind of horses, season of the year, and price of labor are some of the elements entering the problem of transport. The best illustration of the matter will be found among the very able writings of Ellwood Morris, Esq., C. E., in the Journal of the Franklin Institute. Knowing the value of wages, the nature of the earth and length of haul, it is easy to see what mode of transport must have the preference.
CONTRACTOR’S MEASUREMENTS.
120. The price of executing any piece of work is paid to the contractor at stated intervals, generally once each month. The amount of work done at these partial payments is obtained by instrumental reference to the ground. Towards the completion of operations the most correct and easiest method of finding the rate of progress is to deduct the amount already done from the total as given by primary measurement. The full price is not paid to the contractor, but a percentage is kept back, which insures a faithful performance of work. It is impossible to establish a pro rata price at first, owing to the uncertain nature of the work; what appears to be earth may be rock. By deducting a maximum price estimate for all but one of the items, an approximate pro rata value for that one may be determined. An analysis of cost will define the minimum limit for advantage to the contractor; and the pro rata value less the percentage, the maximum for the company’s benefit.
DRAINING.
121. When a level is to be drained, or the water carried off from the surface of a swamp, the first point to be ascertained is the location of the lowest outfall. The direction in which aquatic plants lie show the natural fall of the water, these always pointing down stream. When the most available outlet has been decided upon, a main drain should be set out, from which oblique branches are to be cut, pointing in the direction of the current; into these all minor cuts are to be collected so that the whole district may be equally drained. The fall should be greatest at the most remote points, decreasing as the amount of water increases. Large and deep rivers run sufficiently fast when the fall is one foot per mile. For small rivers, double that is necessary. Ditches and ordinary drains require eight feet per mile. When the water is made to pass away from the surface, it should flow very gradually, that the sides and bottom of the ditches may not be worn away by friction; it should be in constant motion that the channel may be kept clean and increase in velocity as it proceeds. When the surface is a perfect level, the drains should of course be made straight.
After the quantity of water has been determined by careful observation, the section of the main and branches must be fixed, so that regarding both their areas and velocities, the main drain will not be overcharged.
To facilitate the current, the sides should be inclined about one and a quarter to one; and the breadth of base should be two thirds of the depth of water. These results are obtained from the practice of English engineers, who have given a great deal of attention to the subject.
Drains cut through bogs, may have sides nearly, if not quite vertical, as the fibres of plants forming the soil resist the action of the water.
SUBSOIL DRAINING.
Geology has assisted this operation very materially by rendering us acquainted with the quality and nature, as well as of the succession of strata. The soils which are impervious are usually the heaviest, and the porous are those of lighter quality. Clays, when they receive water, will only part with it by evaporation, when left in a natural state; and therefore to make such a surface fit for a useful end requires considerable ingenuity, and often great expense. Such a soil is not rendered unstable by underground springs, and may be effectually drained by boring through, and letting the water off into an under stratum, when this is of a porous nature.