The plan annexed to this pamphlet will exhibit the two lines, and the reader will perceive that a small Lake, called the Lake of Vino Tinto, may, if the first proposal is adopted, be made available, and so lessen the extent of the Canal. If the Rivers are used as a part of the Navigation, the distance between that point of the River Trinidad at which the Canal would commence, as shewn in the plan, and the point where the Farfan ceases to be navigable, is only 25 miles, and there is no high land intervening, the chain of the Andes terminating several miles to the eastward of the valley of the Chagres, as before mentioned. If the other plan be adopted, the length of the Canal will be 58 miles.

Although at first sight it may appear to be a work of supererogation, to carry the Canal over that part of the Isthmus which is traversed by navigable rivers, it is by many engineers considered preferable in forming a Canal, to use the rivers in its vicinity only for the purpose of supplying the Canal with water, and not as a continuation of the inland navigation, on account of the variation in the depth of rivers from floods, or other accidents. Which of these two courses would be most expedient in the present instance, may be safely left to the determination of the engineer selected to carry out the undertaking;—it is sufficient to know that either is practicable, and that the expense of cutting the Canal the whole width of the isthmus would meet with a corresponding return to the undertakers.

The principal difficulty anticipated in the execution of the work, arises from the unhealthiness of the climate on the Atlantic side of the isthmus—a difficulty to which the writer is by no means insensible. It has, however, been exaggerated, and by proper arrangements may be surmounted. The causes of this unhealthiness are chiefly the swampy state of the ground on the Atlantic side of the Isthmus (which the Canal itself, acting as a drain upon the surrounding country, will greatly tend to remove), and the malaria engendered by the closeness of the woods, and by the accumulation of decayed vegetable substances, which the opening of the country, incidental to the formation of the Canal now proposed, and the road afterwards adverted to, will tend to alleviate; and after all, those who have visited this part of the Isthmus, concur in stating that the mortality in the low lands about Chagres is principally owing to the imprudence of the Europeans visiting the country, in exposing themselves to the night dews by sleeping in the open air, and indulging in habits of intemperance.[8] If an association were formed for carrying out the work now projected, one of the first cares of the managers should be to erect huts or barracks for the protection of the workmen against exposure to the weather, and the appointment of a medical officer, who should be entrusted with sufficient powers to ensure obedience to his regulations.

If the industry of the native population could be depended upon, there would be no want of labourers inured to the climate, but the inertness of the natives renders it inexpedient to rely upon them alone; although, working in conjunction with Europeans, and stimulated by their example, and by the love of gain, their services may, no doubt, be made available. There is, however, no difficulty in collecting from the Southern States of North America a sufficient number of Irish labourers inured to a tropical climate, as was lately clearly shewn by the formation of a railway at the Havanna, which was almost entirely constructed by this class of men.

Any deficiency of labourers, it is considered, could easily be drawn from the mining districts of Cornwall, from Ireland itself, or from Scotland, or the North of England.

The next consideration is the expense of constructing a Ship Canal across the Isthmus, and the probable returns. The estimates which have been made, and of which the result is given below, suppose the Canal to be cut through the whole width of the Isthmus, from the Bay of Limon to that of Chorrera, and they include a large outlay for improving the harbours formed by the two bays.

The first item that would occur in an undertaking of the same nature in this country, would be the purchase of the land. Here a great advantage presents itself in the present enterprise; for the Government of New Granada, fully appreciating the permanent advantages to be derived to the state from the execution of a work, which it is unequal to accomplish by its own resources, has repeatedly offered to grant the land required, for 60, 70, or 80 years, according to the magnitude of the works, free of rent, or burdens of any kind, and to admit the importation, free of duty, of all materials and provisions necessary for the undertaking.

EXPENSES.

The expenses of cutting the Canal, and of the direction and management of a Company constituted for that purpose, up to the period of the opening of the Canal have been estimated at[9]£1,713,177
But if it be deemed expedient to raise two millions, in order to provide for any unforseen casualties, the difference will be286,823
Total outlay£2,000,000

RETURNS.