No. BU 2014. Picture Rail.
No. BU 2015. Dado Rail.
| DADO RAILS. | ||||
|---|---|---|---|---|
| Prices at per 100 ft. run:— | ||||
| No. BU | 2016 | £1 16 0 | ||
| ,, | 2017 | 2 6 0 | ||
| ,, | 2015 | 2 15 0 | ||
| ,, | 2018 | 3 11 6 | ||
| ,, | 2019 | 0 11 6 | ||
| ,, | 2020 | 0 14 0 | ||
If less than 100 ft., but more than 50 ft. of any one kind is ordered at one time, add 10 per cent. to above prices. If under 50 ft. add 15 per cent, to above prices.
The following charges will be made for battening mouldings for protection in transit:—50 ft. and under, 0/10; 50 ft. to 100 ft., 1/0; 100 ft. to 150 ft., 1/6; 150 ft. to 200 ft., 2/0; and 0/6 extra for every additional 50 ft.
All mouldings sent carriage forward from Works. Actual samples of the above mouldings, as well as numerous other designs, both plain and enriched, on view in the Building Department.
The above are delivered Carriage Free, subject to the Conditions set forth on pages [3] and [4].
[1176]
No. 17. 16½ in. × 22 in. 2/11 per sheet.
“EMDECA,” Enamelled and Embossed Decorations on Zinc.