The Hydrogen Plant

The original hydrogen plant was enlarged to a capacity output of 353,100 cubic feet (10,000 cubic meters) daily, with storage facilities for 2,118,600 cubic feet (60,000 cubic meters). Since the war, the storage facilities have been reduced to 706,200 cubic feet (20,000 cubic meters) by order of the Allied Commission.

Powerful Radio Station

The Zeppelin wireless plant, started in 1910, has continued to develop with the science of radio and is now able to communicate with the United States.

The duralumin factory is capable of meeting all Zeppelin requirements.

The Great Zeppelin Hangars

The original shed, built in 1908-09 and first used in 1910, is now the ring building factory, where the great transverse frames for the Zeppelins are made. It is 603½ feet (184 meters) long, 150.8 feet (46 meters) wide and stands 65.6 feet (20 meters) high—huge dimensions in the early days but utterly dwarfed by the great sheds which have since appeared alongside. There are double doors at each end, one set operated on the turning, the other on the sliding principle. They are opened and closed by electricity in a few minutes.

In this shed twenty-eight Zeppelins were assembled, the last being LZ-39 after which it was devoted to the transverse ring frames.

PLATE 31