1. The net cost of the gas or other fuel or electric current consumed in lifting the water.

2. The cost of the fuel consumed plus wages, stores, etc., and a proportion of the sum required to repay the capital cost of the pumping station and machinery.

The extra cost of the sewers to carry the additional quantity of storm water might also be taken into account by working out and preparing estimates for the alternative schemes.

The actual cost of the fuel may be taken at approximately 1/4 d. per 1,000 gallons. The annual works and capital charges, exclusive of fuel, should be divided by the normal quantity of sewage pumped per annum, rather than by the maximum quantity which the pumps would lift if they were able to run continuously during the whole time. For a town of about 10,000 inhabitants these charges may be taken at 1-1/4 d. per 1,000 gallons, which makes the total cost of pumping, inclusive of capital charges, 1-1/2 d. per 1,000 gallons. Even if the extra cost of enlarging the sewers is added to this sum it will still be considerably below the sum of 6 d., which represents the cost of providing a separate system for the surface water.

Unless it is permissible for the sewage to have a free outlet to the sea at all states of the tide, the provision of effective storm overflows is a matter of supreme importance. Not only is it necessary for them to be constructed in well- considered positions, but they must be effective in action. A weir constructed along one side of a manhole and parallel to the sewer is rarely efficient, as in times of storm the liquid in the sewer travels at a considerable velocity, and the greater portion of it, which should be diverted, rushes past the weir and continues to flow in the sewer; and if, as is frequently the case, it is desirable that the overflowing liquid should be screened, and vertical bars are fixed on the weir for the purpose, they block the outlet and render the overflow practically useless.

Leap weir overflows are theoretically most suitable for separating the excess flow during times of storm, but in practice they rarely prove satisfactory. This is not the fault of the system, but is, in the majority of the cases, if not all, due to defective designing. The general arrangement of a leap weir overflow is shown in Fig. 17. In normal circumstances the sewage flowing along the pipe A falls down the ramp, and thence along the sewer B; when the flow is increased during storms the sewage from A shoots out from the end of the pipe into the trough C, and thence along the storm-water sewer D. In order that it should be effective the first step is to ascertain accurately the gradient of the sewer above the proposed overflow, then, the size being known, it is easy to calculate the velocity of flow for the varying depths of sewage corresponding with minimum flow, average dry weather flow, maximum dry weather flow, and six times the dry weather flow. The natural curve which the sewage would follow in its downward path as it flowed out from the end of the sewer can then be drawn out for the various depths, taking into account the fact that the velocity at the invert and sides of the sewer is less than the average velocity of flow. The ramp should be built in accordance with the calculated curves so as to avoid splashing as far as possible, and the level of the trough C fixed so that when it is placed sufficiently far from A to allow the dry weather flow to pass down the ramp it will at the same time catch the storm water when the required dilution has taken place. Due regard must be had to the altered circumstances which will arise when the growth of population occurs, for which provision is made in the scheme, so that the overflow will remain efficient. The trough C is movable, so that the width of the leap weir may be adjusted from time to time as required. The overflow should be frequently inspected, and the accumulated rubbish removed from the trough, because sticks and similar matters brought down by the sewer will probably leap the weir instead of flowing down the ramp with the sewage. It is undesirable to fix a screen in conjunction with this overflow, but if screening is essential the operation should be carried out in a special manhole built lower down the course of the storm-water sewer. Considerable wear takes place on the ramp, which should, therefore, be constructed of blue Staffordshire or other hard bricks. The ramp should terminate in a stone block to resist the impact of the falling water, and the stones which may be brought with it, which would crack stoneware pipes if such were used.

In cases where it is not convenient to arrange a sudden drop in the invert of the sewer as is required for a leap weir overflow, the excess flow of storm-water may be diverted by an arrangement similar to that shown in Fig. 18. [Footnote: PLATE IV] In this case calculations must be made to ascertain the depth at which the sewage will flow in the pipes at the time it is diluted to the required extent; this gives the level of the lip of the diverting plate. The ordinary sewage flow will pass steadily along the invert of the sewer under the plate until it rises up to that height, when the opening becomes a submerged orifice, and its discharging capacity becomes less than when the sewage was flowing freely. This restricts the flow of the sewage, and causes it to head up on the upper side of the overflow in an endeavour to force through the orifice the same quantity as is flowing in the sewer, but as it rises the velocity carries the upper layer of the water forward up the diverting plate and thence into the storm overflow drain A deep channel is desirable, so as to govern the direction of flow at the time the overflow is in action. The diverting trough is movable, and its height above the invert can be increased easily, as may be necessary from time to time. With this arrangement the storm-water can easily be screened before it is allowed to pass out by fixing an inclined screen in the position shown in Fig. 18. [Footnote: PLATE IV] It is loose, as is the trough, and both can be lifted out when it is desired to have access to the invert of the sewer. The screen is self- cleansing, as any floating matter which may be washed against it does not stop on it and reduce its discharging capacity, but is gradually drawn down by the flow of the sewage towards the diverting plate under which it will be carried. The heavier matter in the sewage which flows along the invert will pass under the plate and be carried through to the outfall works, instead of escaping by the overflow, and perhaps creating a nuisance at that point.

CHAPTER IX.

WIND AND WINDMILLS.

In small sewerage schemes where pumping is necessary the amount expended in the wages of an attendant who must give his whole attention to the pumping station is so much in excess of the cost of power and the sum required for the repayment of the loan for the plant and buildings that it is desirable for the economical working of the scheme to curtail the wages bill as far as possible. If oil or gas engines are employed the man cannot be absent for many minutes together while the machinery is running, and when it is not running, as for instance during the night, he must be prepared to start the pumps at very short notice, should a heavy rain storm increase the flow in the sewers to such an extent that the pump well or storage tank becomes filled up. It is a simple matter to arrange floats whereby the pump may be connected to or disconnected from a running engine by means of a friction clutch, so that when the level of the sewage in the pump well reaches the highest point desired the pump may be started, and when it is lowered to a predetermined low water level the pump will stop; but it is impracticable to control the engine in the same way, so that although the floats are a useful accessory to the plant during the temporary absence of the man in charge they will not obviate his more or less constant attendance. An electric motor may be controlled by a float, but in many cases trouble is experienced with the switch gear, probably caused by its exposure to the damp air. In all cases an alarm float should be fixed, which would rise as the depth of the sewage in the pump well increased, until the top water level was reached, when the float would make an electrical contact and start a continuous ringing warning bell, which could be placed either at the pumping station or at the man's residence. On hearing the bell the man would know the pump well was full, and that he must immediately repair to the pumping-station and start the pumps, otherwise the building would be flooded. If compressed air is available a hooter could be fixed, which would be heard for a considerable distance from the station.