Above lengths are over all, including Driving Pulley.
For widths, see Floor Plans, [pages 88 and 89]
Drawing Frames are usually made with 4, 5 or 6 deliveries per head or table, and 2, 3 or 4 heads per frame, but can be made with more or less deliveries per head, and more or less heads per frame.
DRAWING FRAMES.
PRODUCTION PER DAY OF TEN HOURS.
NOTE—In the above table 20 per cent. has been deducted for stops, cleaning, etc.
DRAFT GEARING FOR DRAWING FRAMES