[XXXIV-29] Davis' Rept, 8; U. S. Gov. Doc., H. Journ., 1345, Cong. 36, Sess. 1; 541, Cong. 36, Sess. 2; Id., Sen. Doc. 1, pp. 17, 36-44, iii. pt 1, Cong. 36, Sess. 2; Harper's Mag., xxii. 193-209.

[XXXIV-30] New Granada granted, in 1852, to Fox, Cullen, and others, the privilege of opening a canal between Caledonia Bay and the gulf of San Miguel. Cullen's Darien Ship Canal, 1-146. Gisborne thought it was a mere matter of excavation costing about sixty million dollars. After having spent a great deal of time on the examination of the Atrato and San Juan rivers since 1852, F. M. Kelly, of N. Y., in 1864 explored the route from Chepo River to the gulf of San Blas, which is only 30 miles long, but calls for a tunnel. Several surveys followed; namely, Strain, of the U. S. navy, early in 1854, with a party explored the Darien. After several weeks' toil they lost themselves; five men perished, the rest reaching Yavisa on the east coast. About the same time a New Granadan expedition under Codazzi made a similar attempt, but meeting with disaster, after losing several men, gave up the enterprise. The same year English and French officers made explorations. Cullen and Gisborne were with them, and saw their former statements proved false. Next in order is Kennish's examination, followed by Michler and Cravens, of the U. S. navy, who confirmed his report in all essential points. Scherzer, Cent. Am., 250-1; Mex. Anales Min. Fomento, i. 83-8; Strain's Inter. Comm., 18-27. La Charme, in 1865, by order of the merchant Gogorza, surveyed from the south of the gulf of Darien to the gulf of San Miguel by way of the Tuyra River. De Puydt, for the International Colombia Co., reported having found a favorable route from Puerto Escondido to the Tuyra, and thence to the gulf of San Miguel. Abert's Ship Canal, 63-9, 72-9; La Charme, in Putnam's Mag., iii. 329-41; Pan., Gaceta, July 2, 1876; Lond. Geog. Soc., Jour., xxiv. 249; xxxviii. 69-99. Bourdivl, in 1864, passed from the Pacific with 25 men to the mouth of the Lara, and thence across the Isthmus to Chucunaque River, reaching it just below the Sucubti. Here the natives left him for fear of the savages, and he had to return. Rear-adm. C. H. Davis, supt of the U. S. Naval Observatory at Washington, issued a Report on Interoceanic Canals and Railways, for his government, in 1867, reviewing modern explorations of the continent from Darien to Honduras for canals and railroad routes, and giving maps thereof, and a list of authorities thereon. His work is quite thorough to its date. Davis' Rept, 15-19. The secretary of the U. S. navy thus summarized in 1873 the report of Com. Selfridge, who, in 1870-2, made a thorough exploration of several lines in the narrower portion of Darien. This route includes 100 miles of navigation of the Atrato River, which is capable of being navigated by the largest steamers. Between the Atrato and the Pacific, a canal must be made of 28 miles in length, of which it would pass 22 through a plain with a gradual rise of 90 feet. Of the other 6 three would be in moderate cutting, the other three would be of tunnelling. The estimated cost was between $52,000,000 and $63,000,000, and the time for completing the work ten years. The tunnel would be 112 ft high, 60 feet wide, and have 87 ft of clear headway above the surface of the water. The canal would have 25 ft in depth, 50 ft of width at the bottom, and 70 at surface. The locks, 20 in number, were to be 427 ft long, 54 ft wide, with a lift of 10 ft. The water supply, much in excess of the requirement, would be derived from the Napipi River. Two alternative schemes were also presented, increasing the length of tunnelling, and diminishing the number of locks, at an estimated cost of $85,000,000 to $90,000,000. He proved De Puydt's line impracticable. Selfridge's full report, with maps and illustrations, etc., in U. S. Gov. Doc., Darien Explor., Cong. 42, Sess. 3; Brief reports by sec. of the navy and Selfridge, in Id., H. Ex. Doc., i. p. 3 (sec. of navy), vol. iii., pp. 9-10, 133-41, Cong. 41, Sess. 3; Harper's Mag., xlvii. (Nov. 1873), 801-20; Encyclop. Brit. (Am. ed.), iv. 700-1. In 1873 Selfridge surveyed the valley of the Bojaya, another tributary of the Atrato, more to the north, which was regarded as more favorable. The Am. govt despatched two other expeditions in 1874, one of which surveyed a line between the Atrato and the Pacific across the state of Cauca; the other a line parallel with the Panamá railway.

[XXXIV-31] It affords a much shorter route than that of Darien, and the cordillera is there less than 290 ft high. The watershed being nearer the Pacific than the Atlantic, the streams running into the former ocean are of little importance, whereas the Chagres on the Atlantic slope, with its tributary, the Obispo, forms a navigable channel, which in the rainy season attains to formidable proportions.

[XXXIV-32] A copy of the contract and grant appears in Bogotá, Diario Ofic., May 22, 1878; an English translation in U. S. Gov. Doc., H. Ex. Doc., Cong. 46, Sess. 2, i. pt i. 243. Under the contract the Colombian govt will receive at certain periods of it from 6 to 8 per cent of the net receipts; but its share is never to be under $250,000 a year.

[XXXIV-33] The U. S. govt tried to secure by treaty with Colombia the right to establish forts, arsenals, and naval stations on the Isthmus, though no forces were to be kept there in time of peace. A protocol was signed in New York by representatives of both governments in Feb. 1881, to amend the treaty of 1846, but failed of ratification at Bogotá. Diario de Cundinamarca, Apr. 28, 1881; Pan. Star and Herald, May 20, 24, June 24, 25, 1881.

[XXXIV-34] De Lesseps, Wyse, and other officials of the canal, received the highest marks of regard from the people of the Isthmus. Pan. Ley., years 1879-80, 9-11, 30; Id., Gaceta, Feb. 1, 12, 19, 22, 1880; Jan. 27, Feb. 13, 17, 1881. The company at once made provision for a health service, in spacious and well-regulated hospitals, etc. Companyo, Projet d'organiz. du serv. de santé, 1-137, and a map.

[XXXIV-35] The bottom throughout its length, 8½ metres below the mean level of both oceans; width, 22 metres at bottom, 50 metres at top; except through the Culebra ridge, where the depth will be 9 metres, with the width of 24 metres at bottom and 28 metres at top. It must be observed that the levels of the two oceans are not alike at all times; at Colon the difference in the tides never exceeds 23 inches, whereas in Panamá it is usually 13 ft, and at times nearly 20. This must produce a current in the canal sufficient to impede navigation for several hours at each tide. The great difficulties to overcome are the mountain and the river Chagres. The company contemplated at first to tunnel the mountain, but gave up the plan, and resolved to cut down through the solid strata—fortunately soft and otherwise easy—for a depth of between 300 and 400 ft over a long distance. The next task—by far the most difficult one—is to deal with the eccentricities of the Chagres, which discharges at Matachin a volume of water averaging 100 cubic metres per second, which at low water may sink to 15 or 20 cubic metres, and at flood rise to 500 or 600. Several plans have been contemplated, one of which was to construct an enormous dam at Gamboa, between the Obispo and Santa Cruz hills, 960 metres at the base, 1,960 at the top, with a width at bottom, of 1,000 metres, and a height of 45 metres. But it is understood that the engineers have finally concluded to make no use of the waters of the Chagres, but to change their course and let them run to the ocean through the desert; this will be left to the last. Moreover, locks will be built to control the tides. De Lesseps, confident that the canal will be finished in 1889, says there will be no time in the interval to construct the locks; that they can be made later. The chief point being that shipping shall pass through the canal. See Bulletin du Canal Océanique, issued since 1879; Engineering, 1883-4; Reclus, Explor., in Tour du Monde, for a series of views; Sullivan's Problem of Interoc. Communic., Washington, 1883; Ammen's Interoc. Ship Canal, Phila., 1880; N. Y. Herald, Feb. 6, 1882; Encyclop. Brit. (Am. ed., 1885), xviii. 213.

[XXXIV-36] It is estimated that the excavation of the canal proper demands the removal of about 122,000,000 metres, and up to Jan. 31, 1886, only 15,000,000 metres had been done, at an expense of $30,000,000.

[XXXIV-37] Charles D. Jameson, a member of the Boston Society of Civil Engineers, thinks there is no insurmountable obstacle. The following newspapers contain information on the canal's affairs. Pan. Canal, July 12, 1881; Id., Star and Herald, July 20, 1881; July 11, Nov. 10, 1882; and in almost every issue till 1886 inclusive. La Estrella de Pan., July 31, 1884; S. F. Bulletin; Id., Alta Cal.; Id., Morning Call; Id., Chronicle; and every other published on the Pacific coast, as well as in the whole United States; Mex. Financier, July 5, 1884; Correoso's Statement, MS., 9-11.

[XXXIV-38] To raise the original capital the liabilities of the company became $150,000,000, which at 4 per cent equals $6,000,000 annual interest. If ships crossing the canal be charged $3 per ton, $5,780,000 will be yearly required to pay the interest. S. F. Call, Nov. 9, 1886. De Lesseps reckoned the monthly output of excavation, which in 1885 was 658,000 metres and in 1886 1,079,000, should reach 2,000,000 metres a month in 1887, and 3,000,000 metres a month in 1888, and up to the completion of the work in 1889. Pan. Star and Herald, Aug. 5, 7, 11, 12, 1886.