December 8.—The great shield is advancing very slowly, meeting with much interruption by the water, which still runs within the cells, and also by the difficulty of forming abutments for the frames. [Temporary abutments were necessary until the shield was sufficiently advanced to allow of its being pushed forwards from the brickwork built up behind it.]

December 29.—The frames are very much out of level in the transverse line of the Tunnel. This would be attended with serious inconvenience if I had not provided for the means of recovering any irregularity that might take place, and which, as it appears, cannot perhaps be prevented; but having foreseen this, I have provided the remedy by being able to take down the top of each frame, and to remove the top staves in parts, or the whole, at pleasure—a very important provision it proves to be.

January 16, 1826.—Too much precaution cannot be taken, in the management of the frames, to have the leg-screw particularly well secured, as every foot-run of the arch of the Tunnel sustains 82 tons. Each frame carries as follows:—

The two end frames each65 tons = 130
Ten others, each52½ " = 525
655tons.

January 21.—The ground at the top and sides very good; same in the front. In breaking the ground out of the limits of the shield on the right a great deal of ground fell in. This indicates that, if it was not for the protection of the shield, nothing could be done. This accounts also for the occasional breaking of the ground in making the drift in 1809.

Tunnel begun.

The brickwork of the entrance being carried as far as directed, the body of the Tunnel was begun to-day.

Water broke into the works.

January 26.—Isambard went down to Rotherhithe; the water had broken in in great abundance upon the work over Nos. 4 and 5. [The twelve frames were distinguished by numbers.] A 4-inch pipe was driven over the shield from inside the shaft, but the water did not follow it, and the stream augmented very rapidly. The frame No. 5 was moved forward, and it checked the water for a moment, but it came again with violence. A heading was immediately ordered by Armstrong [the resident engineer] from the east well, in which Isambard concurred.

February 3.—Ordered a pit to be opened and made by sinking a curb 8 feet diameter and 18 inches thick, well bound with bolts. [This pit was a well sunk from the surface to enable the gravel containing water, into which the head of the shield had penetrated, to be removed, and clay substituted.]