Both plans were well considered in the present case; but the size of the dock required, the difficulty of finding a proper site for such a dock, the depth required for floating a ship with her engines and boilers, which it was most desirable to introduce while building the hull, and the depth of channel required to communicate between such a dock and the deep water of the river, all combined to render the dock plan a very expensive, and, considering the nature of the soil in which it would have to be formed, a somewhat hazardous proceeding. Launching seems to offer the fewest difficulties and the greatest certainty; but the dimensions of the vessel required some modifications of the usual modes of proceeding.
Launching is generally effected by building the ship on an inclined plane, which experience has determined should be at an inclination of about 1 in 12, to 1 in 15, the keel of the ship being laid at that angle, and the head consequently raised above the stern, say one fifteenth of the whole length of the ship. In the present case this would have involved raising the fore part of the keel, or the fore-foot, about 40 feet in the air, and the forecastle would have been nearly 100 feet from the ground; the whole vessel would have been on an average 22 feet higher than if built on an even keel.
The inconvenience and cost of building at such a great height above ground may be easily imagined; but another difficulty presented itself which almost amounted to an impossibility, and which has been sensibly felt with the larger vessels hitherto launched, and will probably, ere long, prevent launching longitudinally vessels of great length. The angle required for the inclined plane to ensure the vessel moving by gravity being, say 1 in 14, or even if diminished by improved construction in ways to 1 in 25, is such that the end first immersed would become water-borne, or would require a very great depth of water before the forepart of the ship would even reach the water’s edge. Vessels of 450 or 500 feet in length would be difficult to launch in the Thames unless kept as light as possible; but our ship could not be so launched, the heel of the sternpost being required to be, as I before said, about 40 feet below the level of the fore-foot. Some mitigation of the difficulty might be obtained by an improved construction of the ways; but the great length of ways to be carried out into the river would, under any circumstances, be a serious difficulty.
These considerations led me to examine into the practicability of launching or lowering the vessel sideways; and I found that such a mode would be attended with every advantage, and, so far as I can see, it involves no countervailing disadvantages. This plan has been accordingly determined upon, and the vessel is building parallel to the river, and in such a position as to admit of the easy construction of an inclined plane at the proper angle down to low-water mark.
In constructing the foundation of the floor on which the ship is being built, provision is made at two points to ensure sufficient strength to bear the whole weight of the ship when completed. At these two points, when the launching has to be effected, two cradles will be introduced, and the whole will probably be lowered down gradually to low-water mark; whence, on the ensuing tide, the vessel will be floated off. The operation may thus be performed as slowly as may be found convenient; or, if upon further consideration more rapid launching should be thought preferable, it may be adopted.
I have entered at some length into an explanation of all the reasons which led to the adoption of this plan; as I am anxious that they should be known, and particularly that it should be well understood by the proprietors and those interested in our success, that I am not adopting any novelties; unless, so far as those modifications of the more usual practices which experience points out as necessary to meet the peculiarities of a particular case may be deemed such.
I should add that the necessity, arising from the same causes, of launching transversely has been felt with long vessels of another description, namely, pontoons, or floating piers; one of 300 feet in length, which I have built at Plymouth, was so launched, and previously to this, one of 400 feet in length by Mr. Fowler on the Humber.[158]
I hope to be able to arrange that the machinery, which is to be provided by the contractor, for lowering the vessel down the ways will be also fitted to form a ‘patent slip’ arrangement for hauling the ship up for repairs; so that, if it should be found desirable to do so, such apparatus may be purchased for that purpose, and fitted up at the port which the ship will frequent. With the view of facilitating such an operation, or the grounding of the ship on a gridiron for examination at low water, a sufficient extent of the floor of the ship is formed perfectly flat, and is so strengthened as to allow the ship when loaded to be grounded without being unduly strained.
After it was determined that the ship should be built on the river-bank instead of in a dock, and parallel to the river instead of at right angles to it, the next point for consideration was, whether the ship should be lowered gradually to low-water mark, or whether a free launch should be attempted.
In a free launch the ship is allowed by the action of the force of gravity to run down the ways at a considerable velocity. In the case of the ‘Great Eastern’ there were insurmountable objections to this plan. Some of them might have been overcome by mechanical appliances; but these would have introduced complication and additional elements of risk.