To a point in the framing was attached one end of a 2⅝-inch chain cable; this chain was passed round one of the sheaves attached to the cradle, then round the sheave attached to the upper end of the ways, then round the second sheave attached to the cradle; and its end was coiled round the drum. Thus, as one end of the chain was secured, it was necessary, before the ship could move down the ways, that the drum should revolve, and slacken the end of the chain coiled round it.

Round the discs of the drum were wrought-iron straps; these, when tightened by levers, formed brakes by which the revolution of the drum could be retarded. Gearing was provided with a train of toothed wheels, so that the drum could be turned round by handles, and the chain wound on to it.

The following paragraph is from the commencement of a memorandum by Mr. Brunel on the launching arrangements, written about five weeks before the launch began:—

September 26, 1857.

It is expected that, with the present construction of the ways, the friction and the tendency to descend by gravity will be about balanced; so that when once in motion no very great amount of power (at least, in proportion to the mass to be moved) will be required to keep the vessel in motion, or to check it if disposed to move too quick, or quicker at one end than at the other; still the forces which may be required either to help it on or to check it, though relatively small as compared with the mass to be operated upon, will be very large as compared with forces usually obtained by the ordinary means of rope or chain purchases, and at the first start, or after any accidental or intentional stoppage, a still larger power may be required.

The apparatus which Mr. Brunel prepared for performing the double duty of moving the ship down the ways and hauling her off the cradles was as follows:—At each end of the ship was a powerful chain tackle. One end of a chain cable was secured to a mooring in the river, and it was passed round a large sheave attached to the ship, then round a sheave fixed on a barge about 300 feet from the ship, and the end brought on shore, where it was hauled on by a chain tackle worked by a steam crab. The sheave attached to the ship at the bow was slung by chains about 80 feet from the stem. The sheave at the stern was fixed on the end of the screw shaft. These purchases were intended to be good for 80 and 100 tons respectively, and were to be able to follow up the ship quickly if she moved.

In addition to these purchases, Mr. Brunel desired to have ‘the means of bringing a considerable strain to bear in the event of the ship sticking at starting, or at any subsequent time, and particularly at the last;’ and he considered that ‘nothing under 250 or 300 tons would be of any use for the purpose.’ This power he desired to apply to the centre of the ship between the two cradles by means of double crabs and treble purchase blocks on four barges.

One of the double crabs was mounted on each of the four centre barges, and was placed on a platform, elevated so that the blocks of the chain tackle could pass underneath it. This tackle was made fast to a chain attached to the ship; and the mooring chain extending across the river was hauled on by the tackle.

Each of these four crabs and tackle was to be capable of working up to a strain of 80 tons. The strain which Mr. Brunel intended to be able to put on the ship by the river tackle, in the form of a good continuous pull, was in all 500 tons.

Two hydraulic presses were also provided, one at each of the cradles, to overcome adhesion in first moving the ship. Each of these presses should have been able to exert a strain of 300 tons. Therefore, including the force of gravitation, the power which Mr. Brunel hoped to have to start the ship was 2,100 tons, or more than one-sixth of the weight to be moved; and for a continuous steady pull to keep her moving, 1,500 tons, or one-eighth of the weight.