The goods station was erected at about the same time as the passenger station, and is remarkable for the completeness of its arrangements, and for the great use made of hydraulic machinery. This is also applied in the passenger station.[45]
In connection with the Paddington station mention may be made of the Great Western Hotel, which was built at the extremity of the land belonging to the railway company.
When, in 1854, no tenant could be found for it, a few of the shareholders of the Great Western Railway, being unwilling that the building should remain empty and be a loss to the proprietors, formed themselves into a company to lease and work the hotel. Mr. Brunel became a Director, and shortly afterwards (in December 1855) the chairman. He occupied this post till his death, by which time the hotel had become very prosperous. He found attendance at the meetings of the Directors and the supervision of the management of the hotel a very agreeable relaxation from the more important duties which took him to Paddington.
The branches and extensions of the Great Western Railway, as far as their history affected the general interests of the company, are referred to in the chapter on the broad gauge. Branches were opened to Oxford in 1844, to Windsor in 1849, to Wycombe in 1854, to Uxbridge in 1856, to Henley in 1857, and to Brentford in July 1859.
The Bristol and Exeter Railway is a continuation of the Great Western Railway, and was opened to Exeter in 1844. The two portions of it, from Bristol to Taunton, and from Taunton to Exeter, are in marked contrast to each other. The former part of the line is almost level, and has very easy curves. Between Taunton and Exeter it passes over the high ground on the borders of Devonshire, with the Whiteball Tunnel at the summit, ⅝ mile in length. On this part of the line there are long gradients of from 1 in 80 to 1 in 120. Mr. Brunel resigned the position of engineer in 1846, in consequence of differences having arisen between the Bristol and Exeter and the Great Western Companies, which, in Mr. Brunel’s opinion, made it impossible for him to continue engineer to both railways.
The South Devon Railway, and the adoption on it of the Atmospheric System, are described in Chapter VI. In connection with this line is the important Torquay branch, and the railway in continuation of it to Dartmouth. This was completed as far as Paignton during Mr. Brunel’s lifetime.
The South Devon and Tavistock Railway branches off from the South Devon Railway near Plymouth, and has several large viaducts.
On the Cornwall Railway from Plymouth to Truro, and the West Cornwall Railway from Truro to Penzance, the most remarkable works are the viaducts, and the Royal Albert Bridge.
In the case of the Cornwall Railway, it became necessary to reduce the capital expenditure, even at the cost of increasing the charges for maintenance. With this object the line was re-examined and modifications introduced, principally by an increase in the extent of viaduct. These lines pass through a very difficult country; involving the adoption of steep gradients and sharp curves. Mr. Brunel, in a memorandum written in 1845, after having explained his reasons for considering that the prejudicial effects of gradients and curves were commonly overrated, gives the following opinion in reference to the proposed Cornwall Railway:—
I must not be understood to argue against the advantage of straight lines or large and easy curves, but I wish to show that where small curves are unavoidable, they can in practice be so constructed as not to be very prejudicial; and I consider that the character of the country in Cornwall is such that no railway can be constructed at any moderate expense without either sacrificing all consideration for the interests of localities and the position of the population to the mere choice of levels, or without steep gradients and sharp curves.