The tenders accepted were those of Messrs. Boulton and Watt, Messrs. Rennie, and Messrs. Maudslay and Field.

Mr. Brunel left it to the contractors to prepare their designs without any interference on his part, deeming it best to rely on their unfettered judgment.

The task of manufacturing and fitting the cast-iron tube was one of some difficulty, the longitudinal slit allowing of considerable distortion in the casting. This work was undertaken by Mr. George Hennett, by the aid of a set of very effective tools devised by Mr. T. R. Guppy.

The tubes were supplied at the rate of one mile per week, and by the middle of 1846 nearly the whole line was laid to Newton, and the valve was ready to be fixed.

In the autumn of 1846, Mr. Joseph Samuda went to Dawlish, taking with him a staff of assistants trained in the working of the system at Croydon; and every effort was made to advance the completion of the engines and the other parts of the apparatus.

Owing, however, to vexatious delays in the erection of the engine-houses and engines, it was not until the commencement of 1847 that a piston-carriage was able to traverse the first six miles out of Exeter. And, though repeated experimental trains continued to be run, no passengers had been conveyed by Atmospheric trains prior to the general meeting of the shareholders, at the end of August. Mr. Brunel’s report on this occasion was as follows:—

August 27, 1847.

It is a subject of great regret, and to no one more than to myself, that we have as yet been unable to open any portion of the line to the public with the Atmospheric apparatus, although a considerable distance has for some months been in a state to admit of frequent experiments being made upon it. This delay has arisen principally, if not entirely, in that part of the whole system which it might have been expected would have been the least exposed to it—namely, the construction and completion of the steam-engines.

It is due to Mr. Samuda that I should say that, so far as regards the mere pipe and valve, and other details which may be said to constitute the Atmospheric apparatus, we might long since have commenced. But the engines, although designed without any interference with their plans, and furnished by the best makers of the country, and although differing so slightly from the ordinary construction of steam-engines, have proved sources of continued and most vexatious delays, both in the unexpected length of time occupied originally in their erection, and in subsequent correction of defects in minor parts. While the engines were imperfect, it would not only have been unwise to have commenced working the line, even had it been practicable, but the frequent interruptions to the continuous working of all the engines rendered it impossible to complete and test the different portions of the Atmospheric apparatus. There are still some defects to be remedied in one or two of the engines, and I am using every endeavour, by persuasion and by every other means in my power, to urge on the manufacturers in their work of completion. Within the last week or two only have we been able to work at all continuously between Exeter and Teignmouth, so as to have the opportunity of trying the different parts, and getting the various details requisite for actually working trains tested and brought to sufficient perfection to ensure efficiency and regularity.

Since the beginning of last week, however, four trains per day have been run regularly, stopping at the stations, and keeping their time as if working for traffic. The tube and valve appear in good order, and the whole has worked well, but the running in this manner can alone show the deficiencies which may still exist in the details necessary for stopping, and starting quickly from the stations, and all the other minor operations incidental to working the traffic in the ordinary course; and, until all these arrangements are completed, and the engines in more perfect order, I think it would be much better to defer at least the substitution of the Atmospheric for the locomotive working. Trains, in addition to those now running may perhaps be advantageously worked for the public, after a further short continuance of the present practising.