"But with the work in hand all is going on well. There are vigilant eyes on deck. Mr. Bright, the engineer of the company, is there, and Mr. Everett, Mr. De Sauty, the electrician, and Professor Morse. The paying-out machinery does its work, and though it makes a constant rumble in the ship, that dull, heavy sound is music to their ears, as it tells them that all is well. If one should drop to sleep, and wake up at night, he has only to hear the sound of 'the old coffee-mill,' and his fears are relieved, and he goes to sleep again."
Saturday and Sunday passed away without accident, but on Monday, when two hundred miles at sea, in deep water, and safely beyond the great submarine mountain, the electrical continuity was suddenly lost. This interruption amazed and perplexed all on board, but no one was able to remedy it, or to account for it satisfactorily. It lasted for two hours, and then, just as the order was about to be given to cut the cable and endeavor to wind it in, it came back as suddenly and mysteriously as it had disappeared. The greatest delight was now manifested by all on board. "You could see," says the correspondent of the London Times, "the tears of joy standing in the eyes of some as they almost cried for joy, and told their mess-mates that it was all right."
That night, however, the expedition came to grief. The cable was running out freely at the rate of six miles per hour, while the ship was making only four. This was supposed to be owing to a powerful undercurrent. To check this waste of the cable the engineer applied the brakes firmly, which at once stopped the machine. The effect was to bring a heavy strain on the cable that was in the water. The stern of the ship was down in the trough of the sea, and as it rose upward on the swell, the pressure was too great, and the cable parted. The alarm was at once given, and the greatest consternation and grief prevailed on board. "It made all hands of us through the day," says Captain Hudson, "like a household or family which had lost their dearest friend, for officers and men had been deeply interested in the success of the enterprise."
The fleet immediately put about and returned to England, where Mr. Field at once informed the directors of the extent of the disaster. The remaining portions of the cable were landed and stored safely away, and the vessels were returned to their respective Governments. Orders were given for the manufacture of seven hundred miles of cable to replace the portion which had been lost, and to allow for waste in paying it out, and the most energetic preparations were made for another attempt.
Being satisfied that the machine used for paying out the cable was defective, Mr. Field went to Washington and procured from the Navy Department the services of Mr. Wm. E. Everett, the chief engineer of the "Niagara," stating to that gentleman the necessity for a new machine, and urging him to invent it. This Mr. Everett succeeded in doing during the winter. His machine was regarded as a great improvement on that which had been used on the "Niagara." "It was much smaller and lighter. It would take up only about one third as much room on the deck, and had only one fourth the weight of the old machine. Its construction was much more simple. Instead of four heavy wheels, it had but two, and these were made to revolve with ease, and without danger of sudden check, by the application of what were known as self-releasing brakes. These were the invention of Mr. Appold, of London, a gentleman of fortune, but with a strong taste for mechanics, which led him to spend his time and wealth in exercising his mechanical ingenuity. These brakes were so adjusted as to bear only a certain strain, when they released themselves. This ingenious contrivance was applied by Mr. Everett to the paying-out machinery. The strength of the cable was such that it would not break except under a pressure of a little over three tons. The machinery was so adjusted that not more than half that strain could possibly come upon the cable, when the brakes would relax their grasp, the wheels revolve easily, and the cable run out into the sea 'at its own sweet will.' The paying-out machine, therefore, we are far from claiming as wholly an American invention. This part of the mechanism was English. The merit of Mr. Everett lay in the skill with which he adapted it to the laying of the Atlantic cable, and in his great improvements of other parts of the machinery. The whole construction, as it afterward stood upon the decks of the 'Niagara' and the 'Agamemnon,' was the combined product of English and American invention."
In January, 1858, the Board of Directors offered Mr. Field the sum of five thousand dollars per annum if he would assume the post of general manager of the company. He at once undertook the duties of the position, but declined all compensation.
Every thing being in readiness for the second attempt at laying the cable, the "Niagara" sailed from New York in March, 1858, to take on her portion of the cable at Plymouth. The "Agamemnon" was again ordered to assist in the undertaking, and the "Gorgon" was made her consort Mr. Field had hoped that the "Susquehanna" would again be the consort of the "Niagara," but a few days before the sailing of the fleet he was officially informed that he could not have the ship, as she was then in the West Indies, with the greater part of her crew down with the yellow fever. This was a keen disappointment, as every arrangement had been made with the expectation of having the assistance of the "Susquehanna." It was too late to ask the Government at Washington for another ship, and it was by no means certain that the request would be granted if made. In this dilemma Mr. Field frankly stated his disappointment to the Lords of the Admiralty of England, and asked for a ship to accompany the "Niagara." He was informed that the English Government was at that moment chartering vessels to convey troops to Malta, as it had not ships enough of its own, and that it was doubtful whether it could contribute a third ship to the expedition. Still, so greatly did the government desire the success of the enterprise, that a little later on the same day the "Valorous" was ordered to take the place of the "Susquehanna" in the telegraph fleet. This generous assistance was all the more praiseworthy, as it was given at a time when the need of England for ships was very urgent.
After shipping the cable, the squadron sailed from Plymouth on the 29th of May, 1868, for the Bay of Biscay, where the cable was subjected to numerous and thorough tests, which demonstrated its strength and its sensitiveness to the electric current. This accomplished, the vessels returned to Plymouth.
"Among the matters of personal solicitude and anxiety at this time, next to the success of the expedition, was Mr. Field himself. He was working with an activity which was unnatural—which could only be kept up by great excitement, and which involved the most serious danger. The strain on the man was more than the strain on the cable, and we were in fear that both would break together. Often he had no sleep, except such as he caught flying on the railway. Indeed, when we remonstrated, he said he could rest better there than anywhere else, for then he was not tormented with the thought of any thing undone. For the time being he could do no more; and then, putting his head in the cushioned corner of the carriage, he got an hour or two of broken sleep.
"Of this activity we had an instance while in Plymouth. The ships were then lying in the Sound, only waiting orders from the Admiralty to go to sea; but some business required one of the directors to go to Paris, and, as usual, it fell upon him. He left on Sunday night, and went to Bristol, and thence, by the first morning train, to London. Monday he was busy all day, and that night went to Paris. Tuesday, another busy day, and that night back to London. Wednesday, occupied every minute till the departure of the Great Western train. That night back to Plymouth. Thursday morning on board the 'Niagara,' and immediately the squadron sailed."