Preliminary preparations for breaking out should be made during the day, but should be so conducted as not to indicate the selected point to the enemy.

27. Circular places of arms ([Pl. IX], Fig. 83) may be formed in front of a parallel by breaking out two single saps from points 80 to 100 yards apart and so directing them as to meet at 25 or 30 yards in front of the parallel. They may be used by the guards of the trenches or as depots for trench material, etc.

28. Shallow Sap.—When the presence of water in the soil or of rock near the surface prevents driving the full sap 4' 6" deep, a shallow or modified sap ([Pl. II], Figs. 22 and 23) may be used, provided a trench 3' deep can be driven forward. In this case Nos. 1 and 2 must both work kneeling, and Nos. 3 and 4 must throw the earth well to the front and keep the parapet as high as possible, leaving the construction of the berm to the widening party, who will give to the trench the necessary width, and will then obtain earth for strengthening the parapet by deepening the trench when practicable and widening it when necessary, making, however, no irregularities which will injure it as a communication and no depressions which will collect water. This sap advances about as rapidly as the full sap.

29. Overground Approaches.—When the water or rock comes to the surface of the ground, approaches can, under favorable circumstances, be driven for short distances by carrying forward earth in sand-bags, forming with them head and side parapets, and moving forward by continually building up the latter and advancing the former as before described.

The expenditure of time, labor, and sand-bags is so great in driving approaches in this way that the minimum height of parapet (possibly 5') should be made with sand-bags. This may be subsequently heightened and strengthened with earth brought forward in barrows or hand-carts and thrown upon the top and exterior slope.

30. Double Sap.—([Pl. III], Figs. 24, 25, and 26).—The double sap consists of two parallel single saps driven side by side, the cutting lines of the berms, usually 10 feet apart, making the bottom of the completed trench 7 feet wide. It is used when the zigzags, to avoid enfilade, make such a slow advance as to be no longer profitable, i.e., when the amount gained in advance does not exceed ⅓ the length driven. The double sap is directed toward the work, and is exposed to an enfilading and also to a slant fire from both directions. It must therefore have a parapet in front and on both flanks.

31. Execution of the Double Sap.—The double sap is driven by two detachments, each organized and equipped exactly as for a single sap, except that a greater number of sand-bags should be supplied when practicable. The sappers work as in driving a single sap, with the following modifications only: The Nos. 1 prolong their head parapets until they meet, and in advancing their heads of sap leave undisturbed the 4 feet of head parapet intervening between their trenches, but, by continually throwing sand-bags or earth obliquely to the front, keep the head parapet continuous and nearly straight.

This leaves between the trenches made by the Nos. 1 and 2 of the two detachments a tongue of earth 4 feet thick, surmounted with a parapet about 2' or 2' 6" high, which serves as a parados and protects these sappers from reverse fire.

Nos. 3 and 4 of both detachments, in completing their tasks, remove this tongue and pass forward the sand-bags forming its parapet for use by Nos. 1 and 2; otherwise the tasks are as in driving a single sap. When sufficient sand-bags are not available the middle part of the head parapet must be made of loose earth, giving much less protection to Nos. 1 and 2.

This sap, from its method of construction, is completed by the sappers without the assistance of the infantry working parties. Its rate of advance is about the same as that of the single sap.