The Mariner II spacecraft was launched by an Atlas first-stage booster vehicle and an Agena B second stage with restart capability.

ATLAS-AGENA ADAPTER AGENA B MARINER SPACECRAFT SHROUD

The proposed spacecraft would be called Mariner R and was to weigh about 460 pounds and carry 25 pounds of scientific instruments (later increased to 40 pounds). The restart capability of Agena was to be used in a 98-statute-mile parking orbit. (The orbit was later raised to 115 statute miles and the spacecraft weight was reduced to about 447 pounds.)

Two spacecraft would be launched one after the other from the same pad within a maximum launch period extending over 56 days from July to September, 1962. The minimum launch separation between the two spacecraft would be 21 days.

As a result of the JPL recommendations, NASA cancelled Mariner A in September, 1961, and assigned JPL to manage a Mariner R Project to fly two spacecraft (Mariner I and II) to the vicinity of Venus in 1962. Scientific measurements were to be made in interplanetary space and in the immediate environs of the planet, which would also be surveyed in an attempt to determine the characteristics of its atmosphere and surface. Scientific and engineering data would also be transmitted from the spacecraft to the Earth while it was in transit and during the encounter with Venus.

Scientists and engineers were now faced with an arduous task. Within an 11-month period, on a schedule that could tolerate no delays, two spacecraft had to be designed, developed, assembled, tested, and launched. In order to meet the schedule, tested flight assemblies and instruments would have to be in the Pasadena assembly facility by mid-January, 1962, just four months after the start of the project. Probably no other major space project of similar scope had ever been planned on such a demanding schedule.

Mariner II travelled across 180 million miles of space within our solar system as it spanned the gap between Earth and Venus (shown here as the third and second planets, respectively, from the Sun).

With the shipment of equipment to Atlantic Missile Range (AMR) scheduled for 9½ months after inception of the project, management and design teams went all-out on a true “crash” effort. Quick decisions had to be made, a workable design had to be agreed upon very early, and, once established, the major schedule objectives could not be changed. Certain design modifications and manufacturing changes in the Atlas-Agena launch vehicle were also necessary.

Wherever possible, Ranger design technology had to be used in the new spacecraft and adapted to the requirements of a planetary probe. Other necessary tasks included trajectory calculation; arrangements for launch, space flight, and tracking operations; and coordination of AMR Range support.