[First operation]: The bar is inserted through the open chuck.

[Second operation]: Turret being clear back against its stop and revolved to bring present the end gauge, the bar is set against the end gauge, and the chuck is tightened. This chucks the bar and leaves the proper length projecting from the chuck.

[Third operation]: Front tool in the carriage, a bevelled side tool cones the end of the bar so turret tools will start nicely.

[Fourth operation]: Turret being revolved to present the turner, the bar is reduced, at one heavy cut, to near the proper size, the turret stop determining the length of the reduced portion.

[Fifth operation]: Turret being revolved to present the sizer, the body of the bolt is brought to exact size by a light, quick, sliding cut.

Fig. 702.

[Sixth operation]: Open die arm being brought down, the bolt is threaded; the left carriage stop indicating the length of the threaded part.

[Seventh operation]: Turret being revolved to present the die holder, the solid die is run over the bolt, bringing it to exact size with a light cut, and cutting full thread to the exact point desired.