SILVERTON, GLADSTONE & NORTHERLY
Official Roster 1923
0 Silverton 9,300
3.2 Yukon Mills
5.0 Porcupine Gulch
7.0 Fishers Mill
7.5 Gladstone 10,600

No exact date can be found for the tearing up of the rails but it probably was in 1926, the same year the S. R. was dismantled. All equipment went to the S. N. as it already belonged to it anyway.

The government, during our war with Japan, established military posts in Alaska. The railroad up there, the White Pass and Yukon, needed more locomotives and in 1942 it purchased all that were left on the S.N.—the 3, 4 and 34. (The S. N. had ceased operation three years previously.) The 34, as should be remembered, had belonged to the S. G. & N. When the Alaskan railroad received the 34 it numbered it “24”. After Diesel power was obtained there the 24 (nee 34), then about forty years old, was retired to the boneyard.

One of the original S. G. & N. coaches was bought from the S. N., moved to Durango and set up on Main Avenue as the “Pioneer Diner”. Later, after changes and additions, it became the “Chief Diner”. It is still operating and may be seen in Durango.

SILVERTON NORTHERN

Mears hoped to run a railroad from Silverton to Mineral Point and possibly on to Lake City, following practically the same route as the wagon road he had built twelve years previously. C. W. Gibbs, chief engineer, made surveys from Silverton to Eureka in both 1889 and ’90 but nothing was immediately attempted, probably because of all effort and money going toward the construction of the Rio Grande Southern. However, two miles from Silverton to Waldheim were built in 1893 as an extension of the Silverton Railroad.

According to San Juan County records the Silverton Northern was incorporated on September 20, 1895. Fred Walsen was the president, Otto Mears the vice-president and Alex Anderson the secretary-treasurer.

Construction began at the North Star bridge, the end of the first piece of railroad, in late April of 1896 and the 6½ miles were completed to Eureka in late June. The transfer of the property from the construction company to the railroad company was made on July 1st. Silverton Northern books gave the cost of construction as $272,400. Meanwhile the first two miles had been transferred from the Silverton Railroad to the Silverton Northern. A big celebration took place at Eureka on the completion of the line and Mrs. Edward G. Stoiber drove the golden spike. A picture is extant which shows the crowd there.

S. R. Engine 101 was transferred to the S. N. but henceforth was to go by the number of 1. Of course, the company could borrow a locomotive or other equipment from the S. R. or the D. & R. G. as needed.

Ever since the panic of 1893 with its demonetization of silver, mining in the San Juan had been seriously crippled but, since the Sunnyside mine near Eureka and the Silver Lake mine near Waldheim produced good values in gold, the S. N. could make a profit.