3. These collapsible boats should be opened on the deck during each passage of the steamer, and it should be assured that the metal running gear is thoroughly greased and runs smoothly. There should be some oars in the boat, for had there been a sea on when this catastrophe happened, of what earthly use would this boat have been without an oar with which even to steer? Under the conditions in which we worked it was easy enough to get oars, but we never could have got them if it had been at all rough.

The plans of the Lusitania here reproduced are from “Engineering” (London) in the issue for May 14th, 1915.

I think they are the plans originally published in that magazine when the boat was first put into commission in 1907. The arrangement and number of the lifeboats were changed a few years back and were different from those shown in the plan. On her last voyage there were eleven on each side, slung higher to allow space for the collapsible lifeboats that rested on the deck under the regular lifeboats. Also, this plan does not show the extra collapsible lifeboats that were nested out on the after deck. The launch that is indicated on the plan, I did not see.

THE CUNARD LINER “LUSITANIA;” LONGITUDINAL ELEVATION AND DECK PLANS. CONSTRUCTED BY MESSRS. JOHN BROWN AND CO., LIMITED, SHIPBUILDERS AND ENGINEERS, CLYDEBANK.

PART II

The foregoing is the crude Narrative practically verbatim as I sent it home to my people. My first thought was to rewrite it and embody it in the following, but I prefer to let it stand as I gave it to the typist in our London office, reciting the tale to her as the events, still vivid in my mind, passed mentally before me.

In this second part I have tried to round out the Narrative by adding details which would answer questions arising from reading Part One.