After twenty passages from England to America, one of which was marked by very serious disasters, the use of the “Great Eastern” was temporarily abandoned, and this immense ship, arranged to accommodate passengers, seemed no longer good for anything. When the first attempt to lay the Atlantic cable had failed,—partly because the number of ships which carried it was insufficient—engineers thought of the “Great Eastern.” She alone could store on board the 2100 miles of metallic wire, weighing 4500 tons. She alone, thanks to her perfect indifference to the sea, could unroll and immerse this immense cable. But special arrangements were necessary for storing away the cable in the ship’s hold. Two out of six boilers were removed, and one chimney out of three belonging to the screw engine; in their places large tanks were placed for the cable, which was immersed in water to preserve it from the effects of variation of the atmosphere; the wire thus passed from these tanks of water into the sea without suffering the least contact with the air.
The laying of the cable having been successfully accomplished, and the object in view attained, the “Great Eastern” was once more left in her costly idleness. A French company, called the “Great Eastern Company, Limited,” was floated with a capital of 2,000,000 francs, with the intention of employing the immense ship for the conveyance of passengers across the Atlantic. Thus the reason for rearranging the ship to this purpose, and the consequent necessity of filling up the tanks and replacing the boilers, of enlarging the saloons in which so many people were to live during the voyage, and of building extra dining saloons, finally the arrangement of a thousand berths in the sides of the gigantic hull.
The “Great Eastern” was freighted to the amount of 25,000 francs a month. Two contracts were arranged with G. Forrester and Co., of Liverpool, the first to the amount of 538,750 francs, for making new boilers for the screw; the second to the amount of 662,500 francs for general repairs, and fixings on board.
Before entering upon the last undertaking, the Board of Trade required that the ship’s hull should undergo a strict examination. This costly operation accomplished, a long crack in her exterior plates was carefully repaired at a great expense, and the next proceeding was to fix the new boilers; the driving main-shaft of the wheels, which had been damaged during the last voyage, had to be replaced by a shaft, provided with two eccentric wheels, which insured the solidity of this important part. And now for the first time the “Great Eastern” was to be steered by steam.
It was for this delicate operation that the engineers intended the engine which they had placed at the stern. The steersman standing on the bridge between the signal apparatus of the wheels and the screw, has before his eyes a dial provided with a moving needle, which tells him every moment the position of his rudder. In order to modify it, he has only to press his hand lightly on a small wheel, measuring hardly a foot in diameter, and placed within his reach. Immediately the valves open, the steam from the boilers rushes along the conducting tubes into the two cylinders of the small engine, the pistons move rapidly, and the rudder instantly obeys. If this plan succeeds, a man will be able to direct the gigantic body of the “Great Eastern” with one finger.
For five days operations continued with distracting activity. These delays considerably affected the enterprise[enterprise] of the freighters, but the contractors could do no more. The day for setting sail was irrevocably settled for the 26th of March. The 25th still saw the deck strewn with all kinds of tools.
During this last day, however, little by little the gangways were cleared, the scaffoldings were taken down, the fly-wheel cranes disappeared, the fixing of the engines was accomplished, the last screws and nails were driven in, the reservoirs filled with oil, and the last slab rested on its metal mortise. This day the chief engineer tried the boilers. The engine-rooms were full of steam; leaning over the hatchway, enveloped in a hot mist, I could see nothing, but I heard the long pistons groaning, and the huge cylinders noisily swaying to and fro on their solid swing blocks. The muddy waters of the Mersey were lashed into foam by the slowly revolving paddle-wheels; at the stern, the screw beat the waves with its four blades; the two engines, entirely independent of each other, were in complete working order.
Towards five o’clock a small steamer, intended as a shore-boat for the “Great Eastern,” came alongside. Her movable engine was first hoisted on board by means of windlasses, but as for the steamer herself, she could not be embarked. Her steel hull was so heavy that the davits to which it was attached bent under the weight, undoubtedly this would not have occurred had they supported them with lifts. Therefore they were obliged to abandon the steamer, but there still remained on the “Great Eastern” a string of sixteen boats hanging to the davits.
Everything was finished by evening; not a trace of mud was visible on the well-swept boulevards, for an army of sweepers had been at work. There was a full cargo; provisions, goods, and coal filled the stewards’ room, the store, and the coal houses. However, the steamer had not yet sunk to the load water-line, and did not draw the necessary thirty-three feet. It was an inconvenient position for the wheels, for the paddles not being sufficiently immersed, caused a great diminution in the speed.
Nevertheless it was possible to set sail, and I went to bed with the hope of starting next day. I was not disappointed, for at break of dawn I saw the English, French, and American flags floating from the masts.